R EFF : 001-049, 051-099, 101-149, 151-199, 53-31-00Page 641 201-299, 401-499, Aug 01/05
CES
(3)
Install the riser duct and cabin air outlet assembly (Ref. TASK 21-20-00-410-001).
(4)
Install the cove light panels (Ref. TASK 25-23-48-400-001).
(5)
Install the sidewall linings 241CW, 241LW, 242CW, 242LW (Ref. TASK 25-23-47-400-001).
(6)
Install the emergency exit hatches (Ref. TASK 52-21-11-400-001).
(7)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R **ON A/C 151-199, 401-499,
Subtask 53-31-00-410-059-A
B. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the insulation blankets (Ref. TASK 25-80-00-400-001).
(3)
Install the riser duct and cabin air outlet assembly (Ref. TASK 21-20-00-410-001).
(4)
Install the cove light panels (Ref. TASK 25-23-48-400-001).
(5)
Install the sidewall linings 241FW, 242FW (Ref. TASK 25-23-47-400-001).
(6)
Install the emergency exit hatches (Ref. TASK 52-21-11-400-001).
(7)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R EFF : 001-049, 051-099, 101-149, 151-199, 53-31-00Page 642 201-299, 401-499, Aug 01/05
CES
**ON A/C ALL
TASK 53-31-00-210-010
Detailed Visual Inspection of Skin around Anti-Collision Light Cutout, between FR40 and FR41 and between Stringer 1, LH/RH, External Surface
1.
Reason for the Job
__________________
Refer to the MPD TASK: 533130-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific lint-free cloth
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
33-48-11-000-001 Removal of the Upper Beacon/Strobe Light 7LV from the Outside of the Fuselage
33-48-11-400-001 Installation of the Upper Beacon/Strobe Light 7LV
from the Outside of the Fuselage
ASRM 53-31-11-101 (for corrective action)
53-31-00-991-011 Fig. 609
EFF : ALL
53-31-00Page 643
3. Job Set-up
__________ Subtask 53-31-00-010-060
A. Get Access
(1) Remove the upper beacon (Ref. TASK 33-48-11-000-001). WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE
_______
SPECIAL MATERIAL.
THIS MATERIAL IS DANGEROUS.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(2) Clean the area around the anticollision light cutout with CLEANING AGENTS (Material No. 11-003) and a lint-free cloth.
4. Procedure
_________
(Ref. Fig. 609/TASK 53-31-00-991-011) Subtask 53-31-00-210-059
A. Inspection:
(1) Examine the area around the anti-collision light cutout between FR40 and FR41 and STGR1 LH to STGR1 RH for:
-corrosion,
-cracks.
NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-31-11-101) for
____
the correct repair procedure.
EFF : ALL
53-31-00Page 644
Feb 01/03
R
CES
Anti Collision Light Cutout Figure 609/TASK 53-31-00-991-011
R EFF : CES ALL 53-31-00 Page 645 Feb 01/03
5. Close-up
________ Subtask 53-31-00-410-060
A. Close Access
(1)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(56)