__________________
Refer to the MPD TASK: 534106-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific lint-free cloth
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
25-23-43-000-001 Removal of the Upper Sidewall Panel(s)
25-23-43-400-001 Installation of the Upper Sidewall Panel(s)
25-80-00-000-001 Removal of the Insulation Blankets
25-80-00-400-001 Installation of the Insulation Blankets
ASRM 53-41-12-201 (for corrective action)
53-41-00-991-013 Fig. 610
EFF : ALL
53-41-00Page 645
3. Job Set-up
__________ Subtask 53-41-00-010-083
A. Get Access
(1)
Remove the right upper sidewall panels 252PW, 252LW, 252HW (Ref. TASK 25-23-43-000-001).
(2)
Remove the insulation blankets from the inspection area (Ref. TASK 25-80-00-000-001).
WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE
_______
SPECIAL MATERIAL.
THIS MATERIAL IS DANGEROUS.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(3) Clean the inspection area with CLEANING AGENTS (Material No. 11-003) and a lint-free cloth.
4. Procedure
_________
(Ref. Fig. 610/TASK 53-41-00-991-013) Subtask 53-41-00-210-068
A. Inspection
(1) Examine the frame splices at FR53 thru FR56 for cracks. NOTE : If necessary, refer to the ASRM (Ref. ASRM 53-41-12-201) for
____
the correct repair procedure.
EFF : ALL
53-41-00Page 646
May 01/04
R
CES
Frame Splice at FR53 thru FR56 Figure 610/TASK 53-41-00-991-013
R EFF : CES ALL 53-41-00 Page 647 May 01/04
5. Close-up
________ Subtask 53-41-00-410-082
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the insulation blankets (Ref. TASK 25-80-00-400-001).
(3)
Install the right upper sidewall panels 252PW, 252LW, 252HW (Ref. TASK 25-23-43-400-001).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
EFF : ALL
53-41-00Page 648
May 01/04
R
CES TASK 53-41-00-210-012