• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R 53-25-11-000-001 Removal of the Wing-to-Fuselage Fairings (191AT, R 191AB, 192AT, 192AB) 53-39-41-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 53-39-41-010-050

 A. Get Access
 (1)
 Put the access platform in position in zone 191 and 192.

 (2)
 Remove the access panels (Ref. TASK 53-25-11-000-001):


 -191EB, 191LB (left side),
 -192EB, 192LB (right side).
 EFF : ALL
53-39-41Page 401


 4. Procedure
_________ Subtask 53-39-41-020-052
 A. Removal of the Component.
 (Ref. Fig. 401/TASK 53-39-41-991-001)

 (1)
 Compress the spring (8) to remove the nuts (1) and shutter assembly

 (2) easily.

 (2)
 Remove the nut (1).

 (3)
 Remove the shutter assembly (2).

 (4)
 Remove the nuts (3), the bolts (4) and the spacers (5).

 (5)
 Remove the tripod assembly (6).


 EFF : ALL
53-39-41Page 402


 Overpressure Valve
 Figure 401/TASK 53-39-41-991-001
 EFF :  ALL  53-39-41 Page 403 
Feb 01/98
 CES 

 

 TASK 53-39-41-400-002
 Installation of the Overpressure Valve
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R R  No specific  Torque Wrench : range 0.00 to 1.20 m.daN (0.00 to 9.00 lbf.ft)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R  53-25-11-000-001 53-25-11-400-001 53-39-41-991-001  Removal of the Wing-to-Fuselage Fairings (191AT, 191AB, 192AT, 192AB) Installation of the Wing-to-Fuselage Fairings (191AT, 191AB, 192AT, 192AB)Fig. 401
 3. Job Set-up__________
 Subtask 53-39-41-869-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the access platform is in position in zone 191 and 192.
 (2) Make sure that the access panels 191EB, 191LB, 192EB, 192LB are removed : (Ref. TASK 53-25-11-000-001)
 Subtask 53-39-41-210-050
 B. Inspection of Seal.
 (1) Make sure that the seal of the shutter assembly is in good condition.

 EFF : ALL
53-39-41Page 404


 4. Procedure
_________ Subtask 53-39-41-420-050
 A. Installation of Component.
 (Ref. Fig. 401/TASK 53-39-41-991-001)

 (1)
 Put the tripod assembly (6) in position.

 (2)
 Install the bolts (4), the spacers (5) and the nuts (3).

 (3)
 TORQUE the nuts (3) to between 0.35 and 0.45 m.daN (30.97 and 39.82 lbf.in).

 (4)
 Put the shutter assembly (2) in position on the shaft (7).

 (5)
 Compress the spring (8) to install the Shutter assembly (2) and nut

 (1) easily.

 (6)
 Install the nut (1).

 (7)
 TORQUE the nut (1) to between 0.70 and 0.80 m.daN (61.94 and 70.79 lbf.in).

 (8)
 Make sure that the travel range of the shutter assembly (2) is correct.


 5. Close-up
________ Subtask 53-39-41-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panels (Ref. TASK 53-25-11-400-001):

 -191EB, 191LB (left side),
 -192EB, 192LB (right side).

 (3)
 Remove the access platform(s).


 EFF : ALL
53-39-41Page 405


 REAR FUSELAGE - DESCRIPTION AND OPERATION
_________________________________________
 1. General
_______
 **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
 The rear fuselage assembly is a pressurized area, which extends from FR47 to
 FR70. The passenger compartment floor divides the rear fuselage into its
 upper and lower fuselage sections.
 The upper section of the fuselage assembly contains:

 -
the aft section of the passenger cabin

 -
the AFT passenger/crew doors (Ref. 52-13-00), installed between FR66 and FR68, left and right

 -
the aft utility area
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(132)