CES PANELS - CABIN FLOOR - REMOVAL/INSTALLATION
___________________________________________
TASK 53-32-12-000-002
Removal of the Cabin Floor Panels
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power
25-27-51-000-001 Removal of the Heated Floor Panel 5DS (6DS), 15DS (16DS)
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
53-32-12-991-002 Fig. 401
**ON A/C 301-399,
53-32-12-991-002-A Fig. 401A
**ON A/C ALL
3. Job Set-up
__________
Subtask 53-32-12-861-050
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
EFF : ALL
53-32-12Page 401
Subtask 53-32-12-010-050
B. Get access.
(1) Remove the necessary equipment and furnishing to get access to the cabin floor panels.
4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 401/TASK 53-32-12-991-002)
**ON A/C 301-399,
(Ref. Fig. 401A/TASK 53-32-12-991-002-A) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 53-32-12-020-050
A. Removal of the floor panels.
NOTE : This procedure is applicable for all floor panels.
____
(1)
Pull the cord (1) up to remove the sealant from between the floor panel joints.
(2)
Remove the screws (3).
(3)
Remove the floor panels (4). NOTE : Identify the floor panels. This will help the installation
____
procedure.
EFF : ALL
53-32-12Page 402
Cabin Floor Panel Installation - FR35 thru FR47 Figure 401/TASK 53-32-12-991-002
R EFF : 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, 53-32-12 Page 403 Aug 01/05
CES
R R Cabin Floor Panel Installation - FR35.8 thru FR47.5 Figure 401A/TASK 53-32-12-991-002-A
R EFF : 301-399, 53-32-12 Page 404 May 01/04
CES
R **ON A/C 301-399,
R Subtask 53-32-12-020-050-A
R A. Removal of the floor panels.
R NOTE : This procedure is applicable for all floor panels.____
R (1) Pull the cord (1) up to remove the sealant from between the floor
R panel joints.
R (2) Remove the screws (3).
R (3) Remove the floor panels (4).
R NOTE : Identify the floor panels. This will help the installation____
R procedure.
R (4) If necessary remove the heated floor panels, 15DS (16DS), at the AFT
R emergency exits (Ref. TASK 25-27-51-000-001).
CES **ON A/C ALL
TASK 53-32-12-400-002
Installation of the Cabin Floor Panels
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lint free cloth
No specific nonmetallic scraper R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
Material No. 09-016 USA MIL-PRF-81733D TYPE II CLASS B
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(101)