(4)
 Remove the access platform(s).
 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.
 FAIRINGS - WING TO FUSELAGE - REMOVAL/INSTALLATION
__________________________________________________
 TASK 53-25-11-000-001
 Removal of the Wing-to-Fuselage Fairings (191AT, 191AB, 192AT, 192AB)
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS
 -
THE FLIGHT CONTROL SURFACES
 -
THE LANDING GEAR AND THE RELATED DOORS
 -COMPONENTS THAT MOVE.
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.5 m (11 ft. 6 in.)
 B. Referenced Information -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
27-80-00-866-004 Extending the Slats on the Ground 
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 53-25-11-991-001 Fig. 401
 **ON A/C 301-399,
 53-25-11-991-001-A Fig. 401A
 EFF : ALL 
53-25-11Page 401
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION ------------------------------------------------------------------------------- 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, 
 53-25-11-991-002  Fig. 402 
 **ON A/C 301-399, 
 53-25-11-991-002-A  Fig. 402A 
 **ON A/C ALL 
 53-25-11-991-003  Fig. 403 
 3. Job Set-up__________ 
 Subtask 53-25-11-865-050 
 A. Open, safety and tag this(these) circuit breaker(s): 
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/RAM/AIR/INLET 1HZ D10 106VU CSM/G /EV/MAN/SPLY 6XE B04  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 1HH 3HH 24HH 22HH  W22W21X22X21Y21Y20  
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,  
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19
 EFF : ALL 
53-25-11Page 402
R  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18  
R  122VU  4HH  Y19 
 **ON A/C ALL 
 Subtask 53-25-11-869-052 
 B. Aircraft Maintenance Configuration (1) Make sure that the slats are extended (Ref. TASK 27-80-00-866-004). Subtask 53-25-11-010-050 
 C. Get Access 
 (1) Put the access platform in position in the zones 191 and 192. 4. Procedure_________ Subtask 53-25-11-020-051 
R  A. Removal of the Fairing-Wing to Fuselage **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, 
 (Ref. Fig. 401/TASK 53-25-11-991-001) **ON A/C 301-399, 
 (Ref. Fig. 401A/TASK 53-25-11-991-001-A)
 EFF : ALL 
53-25-11Page 403
 Fairing - Left Access Panels Figure 401/TASK 53-25-11-991-001  
R  EFF : 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  53-25-11 Page 404 Aug 01/05 
 CES 
R R  Fairing - Left Access Panels Figure 401A/TASK 53-25-11-991-001-A  
R  EFF :  301-399,  53-25-11 Page 405 May 01/04 
 CES 
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 402/TASK 53-25-11-991-002)
 