May 01/05
R
CES 3. Job Set-up
__________
Subtask 53-21-00-010-079
A. Get Access
(1)
Put an access platform in position at zone 843.
(2)
Open the forward emergency exit door 843 (Ref. TASK 52-22-00-010-002).
Subtask 53-21-00-110-082
B. Cleaning of the Structure
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THIS/THESE
_______ MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
(1) Clean the inspection area with CLEANING AGENTS (Material No. 11-004) and a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003), if necessary.
4. Procedure
_________
Subtask 53-21-00-220-075
A. Inspection
(Ref. Fig. 633/TASK 53-21-00-991-035)
(1) Do a detailed inspection of the upper corners of the forward emergency-exit skin-cutout. This inspection is applicable to the external surface, right side.
EFF : 301-399, 53-21-00Page A680
May 01/05
R
CES
Forward Emergency Exit, Upper corners - External Surface, Right Side Figure 633/TASK 53-21-00-991-035
EFF : 301-399, 53-21-00Page A681 May 01/05 R CES
(2) Make sure that there is no:
(a)
Corrosion damage:
-If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200 P.Block 001) for types of corrosion, inspection, removal and corrosion protection.
(b)
Other damage (cracks, scratches, stress, marks, dents, bumps,...):
-If you find other damage, refer to the Structural Repair Manual (Ref. SRM 511100 P.Block 001) for damage classification and corrective action.
5. Close-up
________
Subtask 53-21-00-410-077
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the forward emergency exit door 843 (Ref. TASK 52-22-00-410-002).
(3)
Remove the access platform(s).
EFF : 301-399, 53-21-00Page A682
May 01/05
R
CES TASK 53-21-00-220-005
Detailed Inspection of Fuselage Skin and Visible Part of Window Forging Doublers around Cabin Windows, between FR 35.3 and FR 35.8 and between ...
1. Reason for the Job
__________________
Refer to the MPD TASK: 532153-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3.5 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-004 USA MIL-T-81533
1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
(Ref. 20-31-00)
Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(22)