• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

53-35-11Page 453
Feb 01/05
R
 CES  Subtask 53-35-11-420-053


 G. Installation of the Access Panel 193AB (194AB)
 (Ref. Fig. 413/TASK 53-35-11-991-020)

 (1)
 Make sure, that the flaps are retracted (Ref. TASK 27-50-00-866-009).

 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Do an inspection of the component interface and/or the adjacent area.

 (4)
 Put the access panel (7) in its correct installation position.

 (5)
 Install the screws (3) in the lower area of the access panel (7), which you can see.

 (6)
 Install the screws (5) in the lower clip assy (4).

 (7)
 Extend the flaps sufficiently to install the screws (3) at the upper side of the access panel (7) (Ref. TASK 27-50-00-866-008).

 (8)
 Install the screws (5) in the upper clip assy (6).

 (9)
 Install the screws (3) in the upper area of the access panel (7).


 (10)
 Make sure, that all the screws of the access panel (7) are installed.

 (11)
 TORQUE the screws (3) to between 3.5 and 4.5 m.daN (25.81 and 33.18 lbf.ft).

 (12)
 TORQUE the screws (5) to between 3.5 and 4.5 m.daN (25.81 and 33.18 lbf.ft).

 (13)
 Put the sealing panel (1) in its correct installation position.

 (14)
 Install the sealing panel (1) with the screws (2).

 (15)
 TORQUE the screws (2) to between 0.35 and 0.45 m.daN (30.97 and 39.82 lbf.in).

 (16)
 Fill out the gaps with the SEALANTS (Material No. 09-016) to get a smooth contour.


 EFF : ALL
53-35-11Page 454
Feb 01/05
R
 CES  **ON A/C ALL


 5. Close-up
________ Subtask 53-35-11-865-052
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 6CV, 7CV, 8CV, 5PB1, 5PB2, 12PB1, 12PB2, 21CE1, 21CE2, 22CE.
 Subtask 53-35-11-410-052
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the MLG doors (Ref. TASK 32-12-00-410-001).

 (3)
 Remove the access platform(s).

 (4)
 Remove the warning notice(s).

 (5)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 EFF : ALL
53-35-11Page 455


 FAIRINGS - COOLING AIR INLET - REMOVAL/INSTALLATION
___________________________________________________
 TASK 53-35-12-000-002 Removal of the Belly Fairing Blowout Panel
 1.
 Reason for the Job

__________________
 Self Explanatory.


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-35-13-000-002  Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-12-991-003 Fig. 401
 3. Job Set-up
__________ Subtask 53-35-12-010-054
 A. Get Access
 (1)
 Put the access platform in position.

 (2)
 Remove the quick-release access panel 192KB (Ref. TASK 53-35-13-000-002).


 EFF : ALL
53-35-12Page 401


 4. Procedure
_________ (Ref. Fig. 401/TASK 53-35-12-991-003) Subtask 53-35-12-020-053
 A. Removal the Blowout Panel and Fittings:
 (1)
 Remove the blowout panel (1):

 (a)
 Open the blowout panel (1). NOTE : To open the blowout panel, you must push the panel by hand

____ from the rear of the quick-release access panel 192KB. When the blowout panel is open, the compression of the spring is released.

 (b)
 Disengage the retaining ring (2) and remove the pin (3).

 (c)
 Remove the nut (4), the washer (5) and disconnect the bonding strap (6).

 (d)
 Install the washer (5) and tighten by hand the nut (4).

 (e)
 Disengage the retaining rings (8) and remove the pins (9) from the two hinge assemblies (10).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUSELAGE 机身2(118)