 **ON A/C ALL
 No data is shown ; but if during the next non-inhibited phase, the warning conditions are still present :
 -
the warning will appear on the upper display unit of the ECAM system

 -
the aural warning will sound

 -
the MASTER CAUT lights will come on.


 1EFF : ALL 1 52-71-00Page 37 1 1 Aug 01/05 1 1 1CES 1


 INTENTIONALLY BLANK

 1 1
52-71-00Page 38
1 1 May 01/04 1 1 1CES 1


 Door Indications on the ECAM Display Units
 Figure 009A

R 1EFF : 151-199, 401-499, 1 52-71-00Page 39/40 1 1 Aug 01/05 1 1 1CES
1R Door Indications on the ECAM Display Units R Figure 009B


 1EFF : 301-399, 1 52-71-00Page 41/42 1 1 May 01/04 1 1 1CES  1EFF : ALL 1 52-71-00Page 501 1 1 May 01/04 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


 DOOR WARNING - ADJUSTMENT/TEST______________________________
 TASK 52-71-00-710-001
 Operational Test of the Door Warning System
 1. Reason for the Job__________________
 Refer to the MPD TASK: 527100-01
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R  No specific No specific No specific No specific  warning noticewrench access platform 3.20 m (10 ft. 6 in.)access platform 3.5 m (11 ft. 6 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R R R  24-41-00-862-002 24-42-00-861-001 31-60-00-860-001 31-60-00-860-002 52-10-00-010-001 52-10-00-410-001 52-10-00-860-001 52-10-00-860-002 52-22-00-010-002 52-22-00-410-002 52-22-00-860-003 52-22-00-860-004  De-energize the Aircraft Electrical Circuits Supplied from the External PowerEnergize the Ground Service Network from the External PowerEIS Start ProcedureEIS Stop ProcedureOpening of the Passenger/Crew DoorClosing of the Passenger/Crew DoorSpecial Precautions before Work on the Passenger/Crew DoorSpecial Precautions after Work on the Passenger/Crew Door Opening of the Emergency Exit Doors from the Outside Closing of the Emergency Exit Doors from the Outside Special Precaution before Maintenance on the Door Damper and Emergency Operation Cylinder Special Precaution after Maintenance on the Door Damper and Emergency Operation Cylinder

 

52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
 **ON A/C 001-049, 051-099, 101-149, 201-299,
 52-71-00-991-006 Fig. 501 R **ON A/C 151-199, 401-499,
 52-71-00-991-006-A Fig. 501A
 **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,

 52-71-00-991-001 Fig. 502 R **ON A/C 151-199, 401-499,
 52-71-00-991-001-B Fig. 502A
 **ON A/C 201-220, 222-223, 225-227, 229-299,

 52-71-00-991-001-A Fig. 502B
 **ON A/C 301-399,

 52-71-00-991-001-C Fig. 502C
 **ON A/C ALL

 3. Job Set-up
__________
 Subtask 52-71-00-861-050

 A. Energize the ground service network (Ref. TASK 24-42-00-861-001).
 1EFF : ALL 1 52-71-00Page 502 1 1 Aug 01/05 1 1 1CES 1 Subtask 52-71-00-865-050


 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 49VU SDAC/1/SPLY 3WV F04 49VU FWS/FWC1/SPLY 3WW F01 121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11 121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10 121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05 121VU EIS/SDAC1 AND 2/DOOR/DET/AVNCS 46WV P02 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU EIS/FWC2/SPLY 2WW Q07 121VU EIS/SDAC/2/SPLY 2WV Q06
 Subtask 52-71-00-865-051
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU LIGHTING/EMER LT/CABIN 2WL H06 49VU LIGHTING/EMER LT/CABIN 1WL H05 122VU LIGHTING/CABIN/EMER/LT 3WL V07
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门7(87)