(9) is 0.5 +0.5 -0.5 mm (0.0196 +0.0196 -0.0196 in.).
1EFF : ALL 1 52-42-18Page 416 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 52-42-18Page 417 1 1 Nov 01/03 1 1 1CES 1 DOOR - GREEN HYDRAULIC SYSTEM GROUND SERVICE PANEL - REMOVAL/INSTALLATION
R R R (6) If the clearances J2 and J3 are not in the tolerances and if the access door (2) is not correctly installed on its frame, do the adjustment below:
R (a) Lightly loosen the nuts (10).
R (b) Modify the position of the ramp (9).
R (c) Tighten the nuts (10).
R (d) Remove the paste from the recess of the ramp (9).
R (7) Door open, make sure that the spacer (2) move freely.
R (8) Take a dynamometer 20 m.daN
R (9) Make sure that :
R R (a) The closing load at the center of the acces door (4) is between 9 daN (20.2328 lbf) to 12 daN (26.9770 lbf).
R R (b) The opening load a the forward extremity of the access door (4) is less than 10 daN (22.4808 lbf).
R (c) The door opening angle is more than 90 degrees.
R **ON A/C ALL
5. Close-up________
Subtask 52-42-18-410-050
A. Close Access
(1) Close the door 192MB.
(2) Make sure that the work area is clean and clear of tool(s) and other items.
(3) Remove the access platform(s).
Subtask 52-42-18-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2QU, 4PR.
_________________________________________________________________________
TASK 52-42-22-000-001
Removal of the Ground Service Panel Door of the Green Hydraulic System (197CB)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2.0 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure
**ON A/C 001-049, 051-061, 101-103, 201-203,
52-42-22-991-001 Fig. 401 R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,
52-42-22-991-001-A Fig. 401A
1EFF : ALL 1 52-42-22Page 401 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
3. Job Set-up
__________
**ON A/C 001-049, 051-061, 101-103, 201-203,
(Ref. Fig. 401/TASK 52-42-22-991-001) R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,
(Ref. Fig. 401A/TASK 52-42-22-991-001-A)
**ON A/C 001-049, 051-061, 101-103, 201-203,
Subtask 52-42-22-010-050
A. Get Access
(1)
Put the access platform in position below the ground service panel door of the Green hydraulic system 197CB.
(2)
Open the access door 197CB.
(3)
If it is necessary to remove the hinges (18) and (19), or the spring bolt assembly of the access door (2):
-remove the access panel 197BB (Ref. TASK 53-35-13-000-002). R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,
Subtask 52-42-22-010-050-A
A. Get Access
(1)
Put the access platform in position below the ground service panel door of the Green hydraulic system 197CB.
(2)
Open the access door 197CB.
1EFF : ALL 1 52-42-22Page 402 1 1 Aug 01/05 1 1 1CES 1
Ground Service Panel Door of the Green Hydraulic System
Figure 401/TASK 52-42-22-991-001
R 1EFF : 001-049, 051-061, 101-103, 201-203, 1 52-42-22Page 403 1 1 May 01/05 1 1 1CES 1
Ground Service Panel Door of the Green Hydraulic System Figure 401A/TASK 52-42-22-991-001-A
R 1EFF : 062-099, 104-149, 151-199, 204-299, 1 52-42-22Page 404 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C ALL