• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 00:06来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  No specific Material No. 08-001 Material No. 19-010  pasteUSA DOD-A-82720 GENERAL PURPOSE ADHESIVE HONEYCOMB FILLER (Ref. 20-31-00)USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00) 
R  C. Expendable Parts 
R R R  -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
R R R  6 12 15  nuts nut cotter pin  52-42-03 03J-010 52-42-18 01G-010 52-42-03 03J-060 

R 1EFF : ALL 1 52-42-18Page 408 1 1 Nov 01/03 1 1 1CES 1


 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
20-28-00-912-004  Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
**ON A/C 001-001, 051-052,
 52-42-18-991-001 Fig. 401 R **ON A/C 106-149, 219-299, 301-399, 401-499,
 52-42-18-991-001-B Fig. 401A
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-218,
 Post SB 53-1136 For A/C 001-001,051-052,
 52-42-18-991-001-A Fig. 401B
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-218,

 52-42-18-991-002 Fig. 402 R **ON A/C 106-149, 219-299, 301-399, 401-499,
 52-42-18-991-002-A  Fig. 402A
 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 52-42-18-869-050

 A. Aircraft Maintenance Configuration
 (1) Make sure that the access platform is in position at the zone 192.
 1EFF : ALL 1 52-42-18Page 409 1 1 Aug 01/05 1 1 1CES 1 Subtask 52-42-18-865-051


 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU FUEL/RFL/DFL/SPLY 2QU L24 122VU ELEC/RFL/SPLY/LOGIC 4PR U29
 4. Procedure
_________
 **ON A/C 001-001, 051-052,

 (Ref. Fig. 401/TASK 52-42-18-991-001) R **ON A/C 106-149, 219-299, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 52-42-18-991-001-B)
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-218,
 Post SB 53-1136 For A/C 001-001,051-052,

 (Ref. Fig. 401B/TASK 52-42-18-991-001-A)
 **ON A/C 001-001, 051-052,

 Subtask 52-42-18-420-051
 A. Installation of the door 192MB.
 (1)
 Put the door (8) in position in its frame on the hinge side.

 (2)
 Install the spring fitting (11) on the door (8).

 (3)
 Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001) in the housing of the screws (16).


 1EFF : ALL 1 52-42-18Page 410 1 1 Aug 01/05 1 1 1CES 1


 (4) Install the cup washers (13), the washers (15) , the bolts (2) and
 (16) and the nuts (3).
 NOTE : Do an electrical bonding when you install the bolts (2), the

____ cup washers (13) and the nuts (3). (Ref. TASK 20-28-00-912-004)
 (5) Tighten the nuts (3).
 (6) Engage the spring (9) on the door frame fitting (1).
 Subtask 52-42-18-820-050

 B. Adjustment of the Proximity Switch (10).
 (1)
 Loosen the nut (4) and the locknut (6) of the stop screw (7).

 (2)
 Adjust the stop screw (7) so that it touches the proximity switch

 (10) before the door (8) is closed.

 (3)
 Make sure that when the door is fully closed, the light is off.

 (4)
 Open the door (8).

 (5)
 Retract the stop screw by 2.5 +0.2 -0.2 mm (0.0984 +0.0078 -0.0078 in.).

 (6)
 Tighten the nut (4) and the locknut (6) on the support fitting (5).

 (7)
 Safety the nut (4) and the locknut (6) with MISCELLANEOUS (Material No. 19-010).


R **ON A/C 106-149, 219-299, 301-399, 401-499,
 Subtask 52-42-18-420-051-B
 A. Installation of the Door 192MB.
 (1) Assembly of the door (4):
 (a)
 Put in position the pin (13) and install the axis (16) with the pin (17), the washers (14) and the new cotter pin (15).

 (b)
 Install the stop contactor (21) with the locknut (20), the washers (19) and the nut (18) on the support fitting (5).


R 1EFF : 001-001, 051-052, 106-149, 219-299, 1 52-42-18Page 411 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 (2)
 Hold the door in position and install the screws (9), the washers (7) and the new nuts (6) and tighten the nuts (6).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门7(10)