__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.50 m (4 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-42-17-991-001 Fig. 401
3. Job Set-up
__________ Subtask 52-42-17-010-050
A. Get Access
(1)
Put an access platform in position at zone 191.
(2)
Open the door 191CB.
1EFF : ALL 1 52-42-17Page 401 1 1 Feb 01/98 1 1 1CES 1
4. Procedure
_________ Subtask 52-42-17-020-051
A. Removal of the Ground Service Conditioned Air Connection Door (Ref. Fig. 401/TASK 52-42-17-991-001)
(1)
Release the spring (5) from the fitting (4).
(2)
Hold the access door (2).
(3)
Remove the nuts (3) and the bolts (1) from the door frame.
(4)
Remove the access door (2).
1EFF : ALL 1 52-42-17Page 402 1 1 Feb 01/98 1 1 1CES 1
Ground Service Conditioned-Air Connection-Door
Figure 401/TASK 52-42-17-991-001
1EFF : ALL 1 52-42-17 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 52-42-17-400-001
Installation of the Ground Service Conditioned-Air Connection-Door (191CB)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-28-00-912-004 Bonding with Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)
52-42-17-991-001 Fig. 401
3. Job Set-up
__________ Subtask 52-42-17-860-050
A. Rf
4. Procedure
_________ Subtask 52-42-17-420-050
A. Installation of the Ground Service Conditioned-Air Connection-Door
(Ref. Fig. 401/TASK 52-42-17-991-001)
(1)
Put the door (2) in position on its housing on the door frame.
(2)
Install the bolts (1) and the nuts (3) and tighten them. NOTE : Do an electrical bonding when you install the bolts (1) and
____ the nuts (3) on each side of the door hinge (Ref. TASK 20-28-00-912-004).
(3)
Put the end of the rod (5) in position on the fitting (6).
(4)
Install the bolt (7) and the nut (4) and tighten it.
1EFF : ALL 1 52-42-17Page 404 1 1 Feb 01/98 1 1 1CES 1 Subtask 52-42-17-210-051
B. Check of the Door Opening/Closing
(1)
Open and close the door.
(2)
Make sure that the door operates correctly.
5. Close-up
________ Subtask 52-42-17-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the door 191CB.
(3)
Remove the access platform(s).
1EFF : ALL 1 52-42-17Page 405 1 1 Feb 01/98 1 1 1CES 1
ACCESS DOOR - FUEL PANEL - REMOVAL/INSTALLATION
_______________________________________________
TASK 52-42-18-000-001
Removal of Fuel Panel Access-Door 192MB
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific access platform 1.50 m (4 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门7(8)