Put the cover profile (7) on the lavatory wall (8) and install the screws (6).
1EFF : ALL 1 52-51-12Page 412 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 106-149, 211-299, 301-399, 401-499,
Subtask 52-51-12-820-050
B. Adjustment
(1)
Make sure that the cockpit door is correctly adjusted (Ref. TASK 52-51-00-820-001).
(2)
Adjust the electrical release strikes in accordance with the cockpit door position (Ref. TASK 52-51-00-820-001).
**ON A/C ALL
Subtask 52-51-12-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1MQ.
Subtask 52-51-12-720-052
D. Do the operational test of the cockpit door lock system (Ref. TASK 52-51-00-710-002).
5. Close-up
________
Subtask 52-51-12-860-052
A. Put the aircraft back to the serviceable condition.
(1)
Make sure that the cockpit door is closed.
(2)
De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
1EFF : ALL 1 52-51-12Page 413 1 1 Aug 01/05 1 1 1CES 1
BUZZER - COCKPIT DOOR LOCKING SYSTEM (23MQ) - REMOVAL/INSTALLATION
__________________________________________________________________ TASK 52-51-13-000-001 Removal of the Buzzer of the Cockpit-Door Locking System
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
Power 25-13-41-000-001 Removal of the Ceiling Panels 52-51-13-991-001 Fig. 401
3. Job Set-up
__________ Subtask 52-51-13-860-051
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. TASK 24-42-00-861-001).
1EFF : ALL 1 52-51-13Page 401 1 1 May 01/05R 1 1 1CES 1
Subtask 52-51-13-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08 122VU LIGHTING/CKPT/DOME 3LE Y06
R **ON A/C 062-099, 106-149, 151-199, 201-299, 301-399, 401-499,
122VU DOORS/PAX/MONG 1MQ T13 **ON A/C ALL
4. Procedure
_________
(Ref. Fig. 401/TASK 52-51-13-991-001)
Subtask 52-51-13-010-051
A. Removal of the Ceiling Panel
(1) Remove the ceiling panel 211HC (5) (Ref. TASK 25-13-41-000-001). Subtask 52-51-13-020-050
B. Removal of the Buzzer
(1)
Disconnect the cable terminals (1) and (2).
(2)
Remove the screws (4).
(3)
Remove the buzzer (3).
1EFF : ALL 1 52-51-13Page 402 1 1 Aug 01/05 1 1 1CES 1
Buzzer of the Cockpit-Door Locking System Figure 401/TASK 52-51-13-991-001
R 1EFF : 1 1 1CES ALL 1 111 52-51-13 Page 403 Feb 01/03
R
TASK 52-51-13-400-001
Installation of the Buzzer of the Cockpit-Door Locking System
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R 24-42-00-861-001 24-42-00-862-001 25-13-41-400-001 52-51-00-710-002 52-51-13-991-001 Energize the Ground Service Network from the External PowerDe-energize the Ground Service Network Supplied from the External PowerInstallation of the Ceiling PanelsOperational Test of the Cockpit Door Lock System (CDLS) Fig. 401