3. Job Set-up
__________ Subtask 52-42-13-860-051
A. Aircraft Maintenance Configuration
(1) Make sure that the access platform is in position at zone 171.
(2) Make sure that the service door 171AL is open. Subtask 52-42-13-140-050
B. Cleaning
(1) Clean the component interface and/or the adjacent area.
4. Procedure
_________ (Ref. Fig. 401/TASK 52-42-13-991-001) Subtask 52-42-13-420-050
A. Install Service Door
(1)
Put the service door 171AL (1) in position.
(2)
Install the springs (3) and the screws (2).
1EFF : ALL 1 52-42-13Page 404 1 1 Feb 01/98 1 1 1CES 1
5. Close-up
________ Subtask 52-42-13-410-051
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 52-42-13-410-050
B. Close Access
(1) Close the service door 171AL. Subtask 52-42-13-942-051
C. Remove Ground Equipment
(1) Remove the access platform(s).
1EFF : ALL 1 52-42-13Page 405 1 1 Feb 01/98 1 1 1CES 1
DOOR - POTABLE WATER SERVICE Z192 - REMOVAL/INSTALLATION
________________________________________________________ TASK 52-42-14-000-001 Removal of the Potable Water Service-Door (192NB)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.60 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-42-14-991-001 Fig. 401
3. Job Set-up
__________ Subtask 52-42-14-010-050
A. Get Access
(1)
Put an access platform in position at zone 192.
(2)
Open the service door 192NB.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 52-42-14Page 401 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
4. Procedure
_________ Subtask 52-42-14-020-050
A. Removal of the Potable Water Service Door
(Ref. Fig. 401/TASK 52-42-14-991-001)
(1)
Release the spring (5) from the fitting (2).
(2)
Remove the nuts (3) and the bolts (4).
(3)
Remove the access door (1).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 52-42-14Page 402 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
Potable Water Service Door 192NB
Figure 401/TASK 52-42-14-991-001
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 52-42-14Page 403 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 52-42-14-400-001
1. Reason for the Job
Installation of the Potable Water Service-Door (192NB) __________________ Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
20-28-00-912-004 Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
52-42-14-991-001 Fig. 401
3. Job Set-up
__________ Subtask 52-42-14-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(2)
Make sure that the access platform is in position.
4. Procedure
_________ Subtask 52-42-14-420-050
A. Installation of the Potable Water Service Door
(Ref. Fig. 401/TASK 52-42-14-991-001)
(1)
Install the door (1) on the hinge side.
(2)
Install the bolts (4) and the nuts (3) and tighten them. NOTE : Do an electrical bonding when you install the bolt (4) and nut