B. Check of the Door Opening/Closing
(1)
Open and close the service door.
(2)
Make sure that the service access door (1) operates correctly.
5. Close-up
________ Subtask 52-42-14-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the service door 192NB.
(3)
Remove the access platform.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 52-42-14Page 405 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
DOOR - CONTROL PANEL, FWD/AFT CARGO COMPARTMENT DOOR - REMOVAL/INSTALLATION
___________________________________________________________________________ TASK 52-42-15-000-001 Removal of the Access Panel (134AR,154AR)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-42-15-991-001 Fig. 401
3. Job Set-up
__________ Subtask 52-42-15-010-050
A. Open the applicable access panels 134AR and/or 154AR.
4. Procedure
_________ (Ref. Fig. 401/TASK 52-42-15-991-001) Subtask 52-42-15-020-050
A. Removal of the Access Panel (14)
(1) Disconnect the rod spring assembly (15) from the hinge (10) as follows:
(a)
Remove the retaining ring (8) from the pin (7).
(b)
Remove the pin (7) from the hinge (10).
(c)
Remove the eye-end of the guide (6) from the fork-end of the hinge (10).
1EFF : ALL 1 52-42-15Page 401 1 1 Feb 01/98 1 1 1CES 1
Control Panel of the FWD/AFT Cargo-Compartment Door 134AR/154AR
Figure 401/TASK 52-42-15-991-001
1EFF : ALL 1 52-42-15Page 402 1 1 Feb 01/98 1 1 1CES 1
(2)
Remove the access panel (14) as follows:
(a)
Remove the retaining rings (9) from the pins (12).
(b)
Hold the access panel (14) and remove the pins (12) from the support fittings (11).
(c)
Remove the access panel (14).
(3)
Remove the spring rod assembly (15) from the stop fitting (1) as follows:
(a)
Remove the retaining ring (3) from the pin (2).
(b)
Hold the spring rod assembly (15) and remove the the pin (2) from the stop fitting (1).
(c)
If necessary, disassemble the guide (4) and the compression spring (5) from the the spring bolt (6).
1EFF : ALL 1 52-42-15Page 403 1 1 Feb 01/98 1 1 1CES 1
TASK 52-42-15-400-001
Installation of the Access Panel (134AR,154AR)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-42-15-991-001 Fig. 401
3. Job Set-up
__________ (Ref. Fig. 401/TASK 52-42-15-991-001) Subtask 52-42-15-420-050
A. Installation of the Access Panel (134AR,154AR)
(1)
Install the spring rod assembly (15) on the stop fittnig (1) as follows:
(a)
Assemble the compression spring (5) and the guide (4) on the the spring bolt (6).
(b)
Put the spring rod assembly (15) in position to the stop fitting
(1) and install the pin (2).
(c)
Saftey the pin (2) with the retaining ring (3).
(2)
Install the access panel (14) as follows:
(a)
Put the hinges (10) and (13) in position to the support fittings
(11) and install the bolts (12).
(b)
Safety the pins (7) with the retaining rings (9).
1EFF : ALL 1 52-42-15Page 404 1 1 Feb 01/98 1 1 1CES 1
(3) Connect the spring rod assembly (15) to the hinge (10) as follows:
(a)
Put the spring rod assembly (15) in position to the hinge (10) and install the bolt (7).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门7(6)