R  5. Close-up________  
R  Subtask 21-31-00-410-059  
R  A. Close Access  
R  (1) Make sure that the work area is clean and clear of tool(s) and other  
R  items.  
R  (2) Install the access panel (1) and the food trolleys in the Aft galley.
R TASK 21-31-00-040-006 R Deactivation of the CPC2 R 1. Reason for the Job
__________________ 
R Refer to the MMEL TASK: 21-31-01 R Pressure Control and Monitoring R Automatic Cabin Pressure Control System R (FAA only) 
R 2. Job Set-up Information
______________________ R A. Fixtures, Tools, Test and Support Equipment R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION R -------------------------------------------------------------------------------R No specific circuit breaker(s) safety clip(s) 
R B. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R -------------------------------------------------------------------------------
R 24-41-00-861-002 R R 24-41-00-862-002 R R 31-60-00-860-001 R 31-60-00-860-002 R 34-10-00-860-002 
R 3. Job Set-up
__________ 
R Subtask 21-31-00-861-067 Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power EIS Start Procedure EIS Stop Procedure ADIRS Start Procedure 
R A. Energize the aircraft electrical circuits R (Ref. TASK 24-41-00-861-002).
R  Subtask 21-31-00-865-070  
R  B. Open, safety and tag this(these) circuit breaker(s):  
R  ------------------------------------------------------------------------------- 
R  PANEL DESIGNATION IDENT. LOCATION  
R  ------------------------------------------------------------------------------- 
R  122VU AIR COND/CAB PRESS/CTL/2 2HL Y22  
R  Subtask 21-31-00-860-071  
R  C. Aircraft Maintenance Configuration  
R  (1) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)  
R  (Ref. TASK 31-60-00-860-001).  
R  (2) On the ECAM control panel do the steps necessary to get the CAB PRESS  
R  page to show on the lower ECAM display unit.  
R  (3) On the AIR COND panel 30VU make sure that:  
R  - the PACK 1 and the PACK 2 pushbutton switches are in the off  
R  position (the OFF legends are on) and,  
R  - the RAM AIR pushbutton switch is in the off position (the ON legend  
R  is off).  
R  (4) Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).  
R  4. Procedure_________  
R  Subtask 21-31-00-710-067  
R  A. Verification Test of the Pressure Control and Monitoring Indications  
R  WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE OUTFLOW VALVES ARE_______  
R  CLEAR. MOVEMENT OF THE OUTFLOW VALVES CAN CAUSE INJURY TO  
R  PERSONS AND/OR DAMAGE TO EQUIPMENT.  
R  WARNING : KEEP AWAY FROM THE MOVING AND ENERGIZED PARTS OF THE OUTFLOW_______  
R  VALVE WHEN YOU OPERATE OR TEST THE VALVE. THESE CAN CAUSE  
R  INJURY TO PERSONS.
R -------------------------------------------------------------------------------R ACTION RESULT R -------------------------------------------------------------------------------
R  1. On the overhead panel 25VU push  
R  the MODE SEL pushbutton switch to  
R  MAN.  
R  
R  
R  
R  2. On the overhead panel 25VU put  
R  the MAN V/S CTL switch to the DN  
R  position.  
R  
R  3. On the overhead panel 25VU put  
R  the MAN V/S CTL switch to the UP  
R  position.  
R  
R  4. On the overhead panel 25VU push  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(9)