R 1EFF : 401-499, 1 21-51-00Page 513 1 1 Aug 01/05 1 1 1CES 1
 -------------------------------------------------------------------------------
R R R R  ACTION RESULT -------------------------------------------------------------------------------After approx. 20 seconds: - the left pack flow indicator moves to the NORM position (between the 11 o'clock and the 1 o'clock position).  
R R R R  After approx. 35 seconds: - the right pack flow indicator moves to the NORM position (between the 11 o'clock and the 1 o'clock position). 
 **ON A/C ALL 
 5. Close-up________  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
 Subtask 21-51-00-865-056 
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1HK 
 **ON A/C ALL 
 Subtask 21-51-00-860-052 
 B. Aircraft Maintenance Configuration 
 (1) Preconditioning 
 (a) Do the Procedure to Stop the APU or, - (Ref. TASK 49-00-00-860-004) or, - (Ref. TASK 49-00-00-860-006) or, - (Ref. TASK 49-00-00-860-009). 
 (b) Stop the preconditiong through the HP connector (Ref. TASK 12-33-21-618-001). 
 (2) Do the EIS stop procedure (Ref. TASK 31-60-00-860-002). 
R 1EFF : ALL 1 21-51-00Page 514 1 1 Aug 01/05 1 1 1CES 1
 (3)
 Remove the ground support and maintenance equipment, the special and
 standard tools and all other items.
 (4)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 1EFF : ALL 1 21-51-00Page 515 1 1 Aug 01/05R 1 1 1CES 1
 TASK 21-51-00-710-003 Operational Test of the Flow Control Valves Closing WARNING : MAKE SURE THAT THE FWD AVIONICS ACCESS DOOR 811 IS OPEN. WITH A
_______ WARNING PLACARD ATTACHED TO IT. THE WARNING NOTICE MUST TELL PERSONS NOT TO CLOSE THE DOOR. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE AIRCRAFT.
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure
 3. Job Set-up
__________ Subtask 21-51-00-861-053
 A. Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).
1EFF : ALL 1 21-51-00Page 516 1 1 Aug 01/05R 1 1 1CES 1
 Subtask 21-51-00-865-053
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R  **ON A/C 401-499, 
 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC  52HH  D08  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  4HK 3HK 2HK 1HK 21HH 23HH 1HH 3HH 24HH 22HH  V20V19V18V17W22W21X22X21Y21Y20  
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,  
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18  
R  **ON A/C 106-149, 303-399,  
R  122VU  4HH  Y19  
R  **ON A/C 401-499,  
R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC  53HH  W22
 -------------------------------------------------------------------------------
R R R R R R  PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 55HH W21 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 49HH X22 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 51HH X21 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 56HH Y21 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC 54HH Y20 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC 50HH Y18  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(107)