A. Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861-002) 
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-51-00Page 409 1201-299, 301-302, 1May 01/05 1 1 1CES 1 Subtask 21-51-00-010-052
 B. Get Access
 (1) Remove the access panel (Ref. TASK 53-35-13-000-002): R (a) FOR 8HB
 -192KB, R (b) FOR 11HB
 -191KB.
 Subtask 21-51-00-941-052
 C. Safety Precautions
 (1)
 On the panel 30VU:
 (a)
 Make sure that:
 -
the APU BLEED pushbutton switch is in the off position (the ON legend is off),
 -
the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on) and,
 -
the PACK 1 and the PACK 2 pushbutton switches are in the off position (the OFF legends are on).
 (b)
 Put a warning notice in position to tell persons not to operate these switches.
 (2)
 On the HP ground connector put a warning notice in position to tell persons not to supply the ground air.
 4. Procedure
_________
 Subtask 21-51-00-440-050
 A. Reactivation of the Pack Flow-Control Valve
 (1)
 Remove and discard the the lockwire from the special screw (1).
 (2)
 Install the special screw (1) in the position (A) and safety it with corrosion-resistant steel lockwire 0.8 mm (0.032 in.) dia.
R (3) FOR 11HB
 (a) Push the PACK 1 pushbutton switch to the on position (the FAULT and the OFF legends are off). 
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-51-00Page 410 1201-299, 301-302, 1May 01/05 1 1 1CES 1
R  (4) FOR 8HB 
 (a) Push the PACK 2 pushbutton switch to the on position (the FAULT and the OFF legends are off). 
 Subtask 21-51-00-810-050  
R R  B. Do the trouble shooting of the flow control valve 11HB (8HB) (Ref. TSM ATA 21) and do the applicable corrective maintenance procedure(s). 
 5. Close-up________ 
 Subtask 21-51-00-410-052 
 A. Close Access 
 (1) Make sure that the work area is clean and clear of tool(s) and other items. 
 (2) Install the access panel (Ref. TASK 53-35-13-400-002):  
R  (a) FOR 8HB - 192KB,  
R  (b) FOR 11HB - 191KB. 
 Subtask 21-51-00-862-053 
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002). 
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-51-00Page 411 1201-299, 301-302, 1May 01/05 1 1 1CES 1R **ON A/C 106-149, 303-399, 401-499,
 TASK 21-51-00-040-001-A
 Deactivation of the Air Conditioning Pack
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 NOTE : The procedure is the same for both air conditioning packs 10HM (11HM)
____
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 21-52-01
 Air cooling system
 Air conditioning pack
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  corrosion-resistant steel lockwire 0.8 mm
 (0.0314 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure 
R 1EFF : 106-149, 303-399, 401-499, 1 21-51-00Page 412 1 1 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R **ON A/C 401-499,
 21-51-00-991-006 Fig. 402 R **ON A/C 106-149, 303-399, 401-499,
 3. Job Set-up
__________
 Subtask 21-51-00-861-056
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(100)