-
apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-001B) to the areas of the dried sealant.
(Ref. Fig. 502/TASK 21-31-00-991-004)
(b) FOR 12HL
-the pin 2 on the electrical connector 12HL-AC and a good conductive surface on the aircraft structure.
-measure the resistance value and make sure that it is not more than the maximum allowed value.
-you must do the bonding of the bonding point 6582VN/DC2 (Ref. TASK 20-28-00-912-004) if the resistance value is more than the allowed value.
NOTE : For this application, when you do the bonding you must:
____
-apply the SEALANTS (Material No. 09-013) to the necessary areas and allow it to fully dry then,
R 1EFF : ALL 1 21-31-00Page 533 1 1 Feb 01/04 1 1 1CES 1
Return Ground Connections - Earthing Points
Figure 502/TASK 21-31-00-991-004- 12 (SHEET 1)
1EFF : ALL 1 21-31-00 Page 534
1 1 Feb 01/98
1 1
1CES 1
Return Ground Connections - Earthing Points
Figure 502/TASK 21-31-00-991-004- 22 (SHEET 2)
1EFF : ALL 1 21-31-00 Page 535
1 1 Feb 01/98
1 1
1CES 1
-apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-001B) to the areas of the dried sealant.
(Ref. Fig. 502/TASK 21-31-00-991-004)
(c)
FOR 10HL1
(d)
FOR 10HL2
1_ the pin J on the electrical connector 10HL-A and a good
conductive surface on the aircraft structure.
- measure the resistance value and make sure that it is not
more than the maximum allowed value.
- you must do the bonding of the bonding point 6587VN/DC1
(Ref. TASK 20-28-00-912-004) if the resistance value is more
than the allowed value.
NOTE : For this application, when you do the bonding you must:____
- apply the SEALANTS (Material No. 09-013) to the
necessary areas and allow it to fully dry then,
- apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL)
(Material No. 07-001B) to the areas of the dried
sealant.
2_ the pin J on the electrical connector 10HL-D and a good
conductive surface on the aircraft structure.
- measure the resistance value and make sure that it is not
more than the maximum allowed value.
- you must do the bonding of the bonding point 6587VN/DC1
(Ref. TASK 20-28-00-912-004) if the resistance value is more
than the allowed value.
NOTE : For this application, when you do the bonding you must:____
- apply the SEALANTS (Material No. 09-013) to the
necessary areas and allow it to fully dry then,
- apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL)
(Material No. 07-001B) to the areas of the dried
sealant.
(Ref. Fig. 502/TASK 21-31-00-991-004)
1 the pin J on the electrical connector 10HL-B and a good
_ conductive surface on the aircraft structure.
-measure the resistance value and make sure that it is not more than the maximum allowed value.
-you must do the bonding of the bonding point 6582VN/DC2 (Ref. TASK 20-28-00-912-004) if the resistance value is more than the allowed value.
1EFF : ALL 1 21-31-00Page 536 1 1 Nov 01/99R 1 1 1CES 1
2 the pin H on the electrical connector 10HL-E and a good
_ conductive surface on the aircraft structure.
-measure the resistance value and make sure that it is not more than the maximum allowed value.
-you must do the bonding of the bonding point 6582VN/DC2 (Ref. TASK 20-28-00-912-004) if the resistance value is more than the allowed value.
NOTE : For this application, when you do the bonding you must:
____
-
apply the SEALANTS (Material No. 09-013) to the necessary areas and allow it to fully dry then,
-
apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-001B) to the areas of the dried sealant.
(Ref. Fig. 502/TASK 21-31-00-991-004)
5. Close-up
________
Subtask 21-31-00-860-067
A. Aircraft Maintenance Configuration
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(20)