 -you must do the bonding of the bonding point 6587VN/DC1 (Ref. TASK 20-28-00-912-004) if the resistance value is more than the allowed value.
 NOTE : For this application, when you do the bonding you must:
____
 -
apply the SEALANTS (Material No. 09-013) to the necessary areas and allow it to fully dry then,

 -
apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-001B) to the areas of the dried sealant.


 (Ref. Fig. 502/TASK 21-31-00-991-004)
 (b) FOR 12HL
 -the pin 2 on the electrical connector 12HL-AC and a good conductive surface on the aircraft structure.
 -measure the resistance value and make sure that it is not more than the maximum allowed value.
 -you must do the bonding of the bonding point 6582VN/DC2 (Ref. TASK 20-28-00-912-004) if the resistance value is more than the allowed value.
 NOTE : For this application, when you do the bonding you must:
____
 -apply the SEALANTS (Material No. 09-013) to the necessary areas and allow it to fully dry then,
R 1EFF : ALL 1 21-31-00Page 533 1 1 Feb 01/04 1 1 1CES 1


 Return Ground Connections - Earthing Points
 Figure 502/TASK 21-31-00-991-004- 12 (SHEET 1)
 1EFF :  ALL  1  21-31-00 Page 534 
1  1  Feb 01/98
 1  1
 1CES  1

 

 Return Ground Connections - Earthing Points
 Figure 502/TASK 21-31-00-991-004- 22 (SHEET 2)
 1EFF :  ALL  1  21-31-00 Page 535 
1  1  Feb 01/98
 1  1
 1CES  1

 

 -apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-001B) to the areas of the dried sealant.
 (Ref. Fig. 502/TASK 21-31-00-991-004)
 (c)
 FOR 10HL1

 (d)
 FOR 10HL2


 1_ the pin J on the electrical connector 10HL-A and a good
 conductive surface on the aircraft structure.
 - measure the resistance value and make sure that it is not
 more than the maximum allowed value.
 - you must do the bonding of the bonding point 6587VN/DC1
 (Ref. TASK 20-28-00-912-004) if the resistance value is more
 than the allowed value.
 NOTE : For this application, when you do the bonding you must:____
 - apply the SEALANTS (Material No. 09-013) to the
 necessary areas and allow it to fully dry then,
 - apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL)
 (Material No. 07-001B) to the areas of the dried
 sealant.
 2_ the pin J on the electrical connector 10HL-D and a good
 conductive surface on the aircraft structure.
 - measure the resistance value and make sure that it is not
 more than the maximum allowed value.
 - you must do the bonding of the bonding point 6587VN/DC1
 (Ref. TASK 20-28-00-912-004) if the resistance value is more
 than the allowed value.
 NOTE : For this application, when you do the bonding you must:____
 - apply the SEALANTS (Material No. 09-013) to the
 necessary areas and allow it to fully dry then,
 - apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL)
 (Material No. 07-001B) to the areas of the dried
 sealant.
 (Ref. Fig. 502/TASK 21-31-00-991-004)

 1 the pin J on the electrical connector 10HL-B and a good
_ conductive surface on the aircraft structure.
 -measure the resistance value and make sure that it is not more than the maximum allowed value.
 -you must do the bonding of the bonding point 6582VN/DC2 (Ref. TASK 20-28-00-912-004) if the resistance value is more than the allowed value.
 1EFF : ALL 1 21-31-00Page 536 1 1 Nov 01/99R 1 1 1CES 1


 2 the pin H on the electrical connector 10HL-E and a good
_ conductive surface on the aircraft structure.
 -measure the resistance value and make sure that it is not more than the maximum allowed value.
 -you must do the bonding of the bonding point 6582VN/DC2 (Ref. TASK 20-28-00-912-004) if the resistance value is more than the allowed value.
 NOTE : For this application, when you do the bonding you must:
____
 -
apply the SEALANTS (Material No. 09-013) to the necessary areas and allow it to fully dry then,

 -
apply the PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-001B) to the areas of the dried sealant.


 (Ref. Fig. 502/TASK 21-31-00-991-004)
 5. Close-up
________
 Subtask 21-31-00-860-067
 A. Aircraft Maintenance Configuration
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn