• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/CAB/PRESS/CTL1 1HL D09 122VU AIR COND/AFT CARGO VENT/FAN 30HN S22 122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY 6HU U19 122VU AIR COND/CAB PRESS/CTL/MAN 3HL Y23 122VU AIR COND/CAB PRESS/CTL/2 2HL Y22
 4. Procedure_________
 Subtask 21-31-51-420-055
 A. To Position the Outflow Valve in the Aircraft 
R  **ON A/C 001-049, 051-061, 101-105,
 (Ref. Fig. 402/TASK 21-31-51-991-004) 
R  **ON A/C 062-099, 
R  (Ref. Fig. 402A/TASK 21-31-51-991-004-A) 
R  **ON A/C 001-049, 051-099, 101-105,
 NOTE : Make sure that there is no blanking plug installed in the static____ port of the outflow valve electronic boxes.
 NOTE : The outflow valve weighs approx. 12.5 kg (27.5577 lb).____ For this part of the procedure the outflow valve must be in the closed position.
 (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
 (2) Clean the component interface and/or the adjacent area.
 NOTE : The joining faces of the outflow valve (5) and the aircraft____ structure must be dry and free from grease and sealant. 

R 1EFF : 001-049, 051-099, 101-105, 1 21-31-51Page 449 1 1 May 01/05 1 1 1CES 1


 (3)
 Make sure that the gasket (6) is in a good condition. If necessary replace the gasket (6).

 (4)
 Carefully put the outflow valve (5) (outflow valve electronics first) through the hole in the aircraft skin.


 NOTE : The actuator side of the outflow valve must point to the
____
 bottom of the aircraft.

 (5)
 Put the outflow valve (5) to one side so that you can get access to the electrical connector (2) 10HL-C.

 (6)
 Remove the blanking caps from the electrical connector (2) 10HL-C and the manual motor (51) 10HL-5.

 (7)
 Make sure that the electrical connectors are clean and in the correct condition.

 (8)
 Connect the electrical connector (2) 10HL-C.

 (9)
 Put the gasket (6) in position on the outflow-valve support structure.


 NOTE : Make sure that the gasket location tab is on the forward,
____
 actuator side of outflow valve.

 (10)
 Carefully lift and put the outflow valve (5) in position on the gasket (6) and make sure that:

 -you do not move the gasket (6) and,
 -the location pins (8) are in the correct position in the outflow-valve support structure.

 (11)
 Install the screws (7). NOTE : Install the screws (7) as identified in the removal procedure


____ but you must only hand tighten them at this time.
 Subtask 21-31-51-865-069
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 -3HL.
R 1EFF : 001-049, 051-099, 101-105, 1 21-31-51Page 450 1 1 May 01/05 1 1 1CES 1 Subtask 21-31-51-860-051


 C. Open the Outflow Valve from the Cockpit WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE OUTFLOW VALVES ARE
_______ CLEAR. MOVEMENT OF THE OUTFLOW VALVES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
 WARNING : KEEP AWAY FROM THE MOVING AND ENERGIZED PARTS OF THE OUTFLOW
_______ VALVE WHEN YOU OPERATE OR TEST THE VALVE. THESE CAN CAUSE INJURY TO PERSONS.
 NOTE : For this procedure we recommend that a minimum of two persons are
____ in constant contact with each other through the service interphone system. One person must operate the outflow valve from the cockpit, the other must be at the outflow valve.
 (1) On the CABIN PRESS panel 25VU:
 -make sure that the MODE SEL pushbutton switch is in the MAN position (the MAN legend is on) and,
 -put the MAN V/S CTL switch to the UP position to open the outflow valve.
 Subtask 21-31-51-865-070
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
122VU AIR COND/CAB PRESS/CTL/MAN 3HL Y23
 Subtask 21-31-51-420-058
 E. Installation of the Outflow Valve R **ON A/C 001-049, 051-061, 101-105,
 (Ref. Fig. 402/TASK 21-31-51-991-004) R **ON A/C 062-099,
R (Ref. Fig. 402A/TASK 21-31-51-991-004-A)
R 1EFF : 001-049, 051-099, 101-105, 1 21-31-51Page 451 1 1 May 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-105,

 

 NOTE : This procedure is only applicable for outflow valves P/N
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(37)