• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (19)
 Connect the electrical connectors (1) 10HL-B, (3) 10HL-A, (23) 10HL-E, (26) 10HL-D and (3) 10HL-C in that order.

 (20)
 Make sure that the work area is clean and clear of tool(s) and other items.


 Subtask 21-31-51-420-064-C
 B. Installation of the Outflow Valve WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME DAMAGED OR
_______
 INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.

 NOTE : This paragraph is only applicable for outflow valve P/N 20790-01AA
____
 and subsequent.

R 1EFF : 201-203, 1 21-31-51Page 432 1 1 May 01/05 1 1 1CES 1 Make sure that there is no blanking plug installed in the static port of the outflow valve electronic boxes.


 (1)
 Make sure that the parts retained from the removed component are
 clean and in the correct condition.


 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Make sure that the gasket (6) is in a good condition. If necessary
 replace the gasket (6).


 (4)
 Make sure that the joining faces of the outflow valve (5) and the
 aircraft structure are free from grease and sealants.


 (5)
 Put the gasket (6) in position on the outflow valve (5).

 (6)
 Carefully put the outflow valve (5) and the gasket (6) in position. NOTE : The outflow valve weighs approx. 12.5 kg (27.5577 lb).


____
 NOTE : Make sure that the location pins (8) are in the correct

____
 position in the outflow valve support-structure.

 (7) From the outside of the aircraft install the outflow valve
 attach-screws (7).

 NOTE : Install the screws (7) as identified in the removal procedure.
____
 (8)
 TORQUE in sequence (refer to sequence chart) the screws (7) to
 between 0.46 and 0.54 m.daN (40.70 and 47.78 lbf.in).


 (9)
 Use a feeler-gage and measure the gap between the support brackets


 (25) and the attachment-lugs of the gearbox assembly.
 (10) Use as necessary a mixture of washer NAS1149C0416R, washer NAS1149C0432R and washer NAS1149C0463R (24) to close the gap.
 NOTE : The maximum gap limit is 0.00 +0.35 -0.35 mm (0.0000 +0.0137 -
____
 0.0137 in.)

 (11)
 Install the bolts (22) and the washers (21) in the support brackets (25).

 (12)
 Tighten the bolts (22) (Ref. TASK 20-28-00-912-004).


R 1EFF : 201-203, 1 21-31-51Page 433 1 1 May 01/05 1 1 1CES 1


 (13)
 Put the bonding strap (4) in position on the outflow valve (5) and install the washer (28) and the bolt (27) (Ref. TASK 20-28-00-912-004).

 (14)
 Put the bonding strap (4) in position and temporarily install the washer (28) and the bolt (27).

 (15)
 Put the grill (9) in position in the retaining clips (10) and install the quick release fasteners (12).

 (16)
 Remove the bolt (27) and the washer (28).

 (17)
 Put the bonding straps (4) and (11) in position and install the washer (28) and the bolt (27) (Ref. TASK 20-28-00-912-004).

 (18)
 Remove the blanking caps from the disconnected electrical connectors.

 (19)
 Make sure that the electrical connectors are clean and in the correct condition.

 (20)
 Connect the electrical connectors (1) 10HL-B, (3) 10HL-A, (23) 10HL-E, (26) 10HL-D and (2) 10HL-C in that order.

 (21)
 Make sure that the work area is clean and clear of tool(s) and other items.


 **ON A/C ALL
 Subtask 21-31-51-865-052
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1HL, 2HL, 3HL, 6HU, 30HN.
 Subtask 21-31-51-710-050
 D. Test the Pressure Control and Monitoring System NOTE : The Operational Test of the Pressure Control and Monitoring System
____ must be performed on both system channels. Ensure that TEST OK or a failure message is displayed. If the test is interrupted it must be restarted until TEST OK or failure message is displayed.
 (1) Do the operational test of the pressure control and monitoring system (Ref. TASK 21-31-00-710-002).
R 1EFF : ALL 1 21-31-51Page 434 1 1 May 01/05 1 1 1CES 1


 (2) Do the operational test of the manual pressure control and monitoring

 system (Ref. TASK 21-31-00-710-003).
 ________

5. Close-up
 Subtask 21-31-51-410-055
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(33)