• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 5. Close-up________
 Subtask 21-51-41-410-050-A
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Close the access panels (Ref. TASK 53-35-13-400-002): 
R  (a) FOR 100HM 191KB and 191BB. 
R  (b) FOR 101HM 192KB and 192FB.
 Subtask 21-51-41-862-050
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002). 

R 1EFF : 001-049, 101-105, 151-199, 1 21-51-41Page 424 1 1 May 01/05 1 1 1CES 1


 TASK 21-51-41-920-001 Remove Ozone Filter (Converter) for Functional Check
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 215141-01


 2.
 Job Set-up Information


______________________
 A. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
30 ozone filter 21-51-03 11C-080 30 ozone filter 21-51-03 11C-080A 30 ozone filter 21-51-03 11F-080 30 ozone filter 21-51-03 11F-080A
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-51-41-000-001 Removal of the Ozone Filter (Converter) 100HM (101HM) 21-51-41-400-001 Installation of the Ozone Filter 100HM (101HM)
 3. Job Set-up
__________ Subtask 21-51-41-010-051
 A. Not applicable.
 4. Procedure
_________ Subtask 21-51-41-020-052
 A. Remove the ozone filter (30) (Ref. TASK 21-51-41-000-001). Subtask 21-51-41-920-050
 B. Send the removed ozone filter to the manufacturer for the effectivness check.
R 1EFF : 001-049, 101-105, 151-199, 1 21-51-41Page 425 1 1 May 01/05 1 1 1CES 1 Subtask 21-51-41-420-052


 C. Install the new ozone filter (30) (Ref. TASK 21-51-41-400-001).
R 1EFF : 001-049, 101-105, 151-199, 1 21-51-41Page 426 1 1 May 01/05 1 1 1CES 1


 FILTER - OZONE (100HM,101HM) - INSPECTION/CHECK
_______________________________________________ TASK 21-51-41-200-001 Attachment Components (In-Service Wear Limits) - Ozone Filter 100HM (101HM)
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-51-00-300-001 Attachment Components - Repair/Replacement 21-51-41-991-004 Fig. 601
 3. Job Set-up
__________ Subtask 21-51-41-010-053
 A. Get Access
 (1) Make sure that the applicable components are disassembled to do the inspection procedure.
 4. Procedure
_________ (Ref. Fig. 601/TASK 21-51-41-991-004) Subtask 21-51-41-210-051
 A. Visual Inspection of the Spherical Bearings in the Support-Rod and
 Bracket Assembly

 (1) On the support-rod (1):
 (a) Use an applicable measurement method and do a check for radial and axial play at the spherical bearings (2).
R 1EFF : 001-049, 101-105, 151-199, 1 21-51-41Page 601 1 1 May 01/05 1 1 1CES 1


 Ozone Filter - Attachment Components
 Figure 601/TASK 21-51-41-991-004

R 1EFF : 001-049, 101-105, 151-199, 1 21-51-41Page 602 1 1 May 01/05 1 1 1CES 1


 (b) If you find more than 0.05 mm (0.0019 in.) radial play or more than 0.2 mm (0.0078 in.) axial play in a spherical bearing (2) then you must replace the applicable rod eye-end (Ref. TASK 21-51-00-300-001).
 (2) On the bracket assembly (12):
 (a)
 Use an applicable measurement method and do a check for radial and axial play at the spherical bearings (2).

 (b)
 If you find more than 0.05 mm (0.0019 in.) radial play or more than 0.2 mm (0.0078 in.) axial play in a spherical bearing (2) then you must replace the bracket assembly (12).


 Subtask 21-51-41-220-051
 B. In-Service Wear Limits
 (1) Use applicable measurement equipment and measure the outside diameter (OD) of the bushings (6) and the inside diameter (ID) of the shouldered bushings (4).
 NOTE : If any of the components are 'out of limits' then you must
____
 replace them.

 -for item (4) (Ref. TASK 21-51-00-300-001).
 -------------------------------------------------------------------------------| FIG. | ORIGINAL MANUFACTURING LIMITS | IN-SERVICE WEAR LIMITS | | DETAIL |---------------------------------------|----------------------------| | AND | DIMENSION | ASSEMBLY CLEARANCE| DIMENSION LIMITS | MAX. | | ITEM | MM (IN.) | MM (IN.) | MM (IN.) | ALLOW. | | NO. |-------------------|-------------------|---------|---------| CLEAR. | | | MIN. | MAX. | MIN. | MAX. | MIN. | MAX. |MM (IN.)| |--------|---------|---------|---------|---------|---------|---------|--------| | BB | 8.986 | 8.995 | | | 8.979 | | | | OD 6 |(0.3537) |(0.3541) | | |(0.3535) | | | | | | | 0.005 | 0.029 | | | 0.043 | | | | | (0.0001)| (0.0011)| | |(0.0016)| | BB | 9.000 | 9.015 | | | | 9.022 | | | ID 4 |(0.3543) |(0.3549) | | | |(0.3551) | | -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(126)