R **ON A/C ALL
 Subtask 21-43-00-865-082
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------
PANEL DESIGNATION FIN LOCATION
 -------------------------------------------------------------------------------
122VU AIR COND/AFT CARGO VENT/CTL AND/MONG 31HN 20 S
 or alternative location :-
49VU AIR COND/AFT CARGO/VENT/CTL & MONG 31HN 07 C
 Subtask 21-43-00-710-060
 E. Do the operational test of the pack temperature-control system (Ref. TASK 21-61-00-710-001).
 5. Close-up
________
 Subtask 21-43-00-410-059
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 (2)
 Install the access panel (Ref. TASK 25-55-11-400-003):
 (a) FOR 13HC
 -151EW.
 (3)
 Install the access panel (Ref. TASK 25-55-11-400-002):
 (a) FOR 14HC
 -151BC.
 (4)
 Close the Aft cargo-compartment door 826 (Ref. TASK 52-30-00-860-002),
 (5)
 Remove the access platform(s).
 (6)
 Remove the warning notice(s).
 Subtask 21-43-00-862-063
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 SENSOR - DUCT TEMPERATURE (AFT CARGO COMPARTMENT) (13HC,14HC)
_____________________________________________________________ REMOVAL/INSTALLATION
____________________
 TASK 21-43-15-000-001
 Removal of the Aft Cargo-Compartment Temperature-Sensors 13HC and 14HC
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power
 52-30-00-860-001  Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
R **ON A/C 001-049, 051-099, 101-105, 201-213,
 21-43-15-991-001  Fig. 401 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R **ON A/C 151-199, 401-499,
 21-43-15-991-001-A Fig. 401A
 **ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
 Post SB 21-1141 For A/C 001-049,051-099,101-105,201-213,
 21-43-15-991-001-B Fig. 401B
 FOR FIN 13HC
 25-55-11-000-003 Removal of the Sidewall Panels in the AFT Cargo
 Compartment - FR47/FR59
 FOR FIN 14HC
 25-55-11-000-002 Removal of the Ceiling Panels in the AFT Cargo
 Compartment - FR47/FR59
 25-55-11-000-003 Removal of the Sidewall Panels in the AFT Cargo
 Compartment - FR47/FR59
 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 21-43-15-861-051
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 Subtask 21-43-15-865-050
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(72)