R **ON A/C ALL
Subtask 21-43-00-865-082
D. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION FIN LOCATION
-------------------------------------------------------------------------------
122VU AIR COND/AFT CARGO VENT/CTL AND/MONG 31HN 20 S
or alternative location :-
49VU AIR COND/AFT CARGO/VENT/CTL & MONG 31HN 07 C
Subtask 21-43-00-710-060
E. Do the operational test of the pack temperature-control system (Ref. TASK 21-61-00-710-001).
5. Close-up
________
Subtask 21-43-00-410-059
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panel (Ref. TASK 25-55-11-400-003):
(a) FOR 13HC
-151EW.
(3)
Install the access panel (Ref. TASK 25-55-11-400-002):
(a) FOR 14HC
-151BC.
(4)
Close the Aft cargo-compartment door 826 (Ref. TASK 52-30-00-860-002),
(5)
Remove the access platform(s).
(6)
Remove the warning notice(s).
Subtask 21-43-00-862-063
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
SENSOR - DUCT TEMPERATURE (AFT CARGO COMPARTMENT) (13HC,14HC)
_____________________________________________________________ REMOVAL/INSTALLATION
____________________
TASK 21-43-15-000-001
Removal of the Aft Cargo-Compartment Temperature-Sensors 13HC and 14HC
WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
R **ON A/C 001-049, 051-099, 101-105, 201-213,
21-43-15-991-001 Fig. 401 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R **ON A/C 151-199, 401-499,
21-43-15-991-001-A Fig. 401A
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
Post SB 21-1141 For A/C 001-049,051-099,101-105,201-213,
21-43-15-991-001-B Fig. 401B
FOR FIN 13HC
25-55-11-000-003 Removal of the Sidewall Panels in the AFT Cargo
Compartment - FR47/FR59
FOR FIN 14HC
25-55-11-000-002 Removal of the Ceiling Panels in the AFT Cargo
Compartment - FR47/FR59
25-55-11-000-003 Removal of the Sidewall Panels in the AFT Cargo
Compartment - FR47/FR59
**ON A/C ALL
3. Job Set-up
__________
Subtask 21-43-15-861-051
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 21-43-15-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(72)