• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 Pressure Sensor
 Figure 401A/TASK 21-51-11-991-001-A22 (SHEET 2)

R 1EFF : 004-049, 055-099, 101-149, 151-199, 1 21-51-11Page 407 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 (e)
 Remove the nut (28), the washer (27), the screw (25) and disconnect the bonding strap (26).

 (f)
 Remove the screws (31), the washers (30), the pressure sensor


 (29) and the clamps (22).
 (g) Remove the clamps (22) from the pressure sensor (29). R **ON A/C 004-049, 055-099, 101-105, 151-199, 201-299, 301-302,
 Subtask 21-51-11-020-050-A
 A. Removal of the Pressure Sensor R (1) FOR 10HB
 (a)
 Disconnect the electrical connector (7).

 (b)
 Put blanking caps on the disconnected electrical connectors.

 (c)
 Disconnect the sense line connectors (1) and (5).

 (d)
 Put blanking plugs on the disconnected line ends.

 (e)
 Remove the nut (11), the washer (10), the screw (8) and disconnect the bonding strap (9).

 (f)
 Remove the screws (4), the washers (3), the pressure sensor (12) and the clamps (2).


 (g) Remove the clamps (2) from the pressure sensor (12). R (2) FOR 9HB
 (a)
 Disconnect the electrical connector (24).

 (b)
 Put blanking caps on the disconnected electrical connectors.

 (c)
 Disconnect the sense line connectors (21) and (32).

 (d)
 Put blanking plugs on the disconnected line ends.

 (e)
 Remove the nut (28), the washer (27), the screw (25) and disconnect the bonding strap (26).


R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-51-11Page 408 1201-299, 301-302, 1May 01/05 1 1 1CES 1


 (f)
 Remove the screws (31), the washers (30), the pressure sensor

 (29) and the clamps (22).

 (g)
 Remove the clamps (22) from the pressure sensor (29).


R 1EFF : 004-049, 055-099, 101-105, 151-199, 1 21-51-11Page 409 1201-299, 301-302, 1May 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,

 

 TASK 21-51-11-400-001 Installation of the Differential Pressure Sensor 9HB (10HB) WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.

 NOTE : The procedure is the same for the pressure sensors 9HB and (10HB).
____
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-014A  USA MIL-PRF-907
 HIGH TEMPERATURECOMPOUND (Ref. 20-31-00)

R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-51-11Page 410 1201-299, 301-302, 1May 01/05 1 1 1CES 1


 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection 12-33-21-618-001 Pre-conditioning with the APU 20-28-00-912-004 Electrical Bonding of Components With Conductive
 Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-21-51-00-710-002 Operational Test of the Flow Control and Indicating System 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure

R **ON A/C 001-003, 051-054,
 21-51-11-991-001 Fig. 401

R **ON A/C 004-049, 055-099, 101-105, 151-199, 201-299, 301-302,
 21-51-11-991-001-A Fig. 401A
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,
 3. Job Set-up
__________
 Subtask 21-51-11-860-050
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(113)