 FOR 101HM 49VU AIR COND/FLOW/CTL &/IND1 1HB D07 122VU AIR COND/FLOW/MIXER/FLAP 3HB V22 122VU AIR COND/FLOW/CTL AND IND/2 2HB V21 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 23HH W21 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 24HH Y21 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20
 1EFF : 051-099, 201-299, 301-302, 1 21-51-51Page 477 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 21-51-51-710-052
 E. Test
 (1)
 Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).

 (2)
 Do a leak check of the air ducts. NOTE : Minimum leakage is permitted. After the pack operates some

____ minutes, the leakage of air will reduce because the seals have their correct operating temperature.

 (3)
 Do a leak check of the sense line connections.
 NOTE : Leaks are not permitted.


____

 (4)
 After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).

 (5)
 Do the operational test of the pack temperature control system (Ref. TASK 21-61-00-710-001).


 5. Close-up
________ Subtask 21-51-51-410-057
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access panels (Ref. TASK 53-35-13-400-002):

 (a)
 FOR 100HM
 191KB and 191BB.


 (b)
 FOR 101HM
 192KB and 192FB.

 

 

 Subtask 21-51-51-862-052
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
R 1EFF : 051-099, 201-299, 301-302, 1 21-51-51Page 478 1 1 Aug 01/05 1 1 1CES 1


R  **ON A/C 106-149, 303-399, 401-499,
 TASK 21-51-51-000-002-A
 Removal of the Air Duct upstream of the Flow Control Unit
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific No specific  circuit breaker(s) safety clip(s)protective covers
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-51-51-200-002 24-41-00-861-002 53-35-13-000-002  Attachment Components (In-Service Wear Limits) - Air DuctEnergize the Aircraft Electrical Circuits from the External PowerRemoval of the Quick-Release Access Panels from the Belly Fairing Structure 
R  **ON A/C 106-149, 303-399, 
R  21-51-51-991-006  Fig. 403A 
R  **ON A/C 401-499,
 21-51-51-991-006-A  Fig. 403B 

R 1EFF : 106-149, 303-399, 401-499, 1 21-51-51Page 479 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
R  **ON A/C 106-149, 303-399, 401-499,
 21-51-51-991-008  Fig. 405A
 3. Job Set-up__________
 Subtask 21-51-51-861-055
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 Subtask 21-51-51-865-066
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 23HB 
R  **ON A/C 401-499,
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  52HH 49HH 51HH 50HH  D08 X22X21Y18 
R  **ON A/C 106-149, 303-399, 401-499,
 FOR 24HB 
R  **ON A/C 401-499,
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20 

R 1EFF : 106-149, 303-399, 401-499, 1 21-51-51Page 480 1 1 Aug 01/05 1 1 1CES 1
 