• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:47来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


R 1EFF : 051-054, 1 21-51-51Page 474 1 1 Aug 01/05 1 1 1CES 1


 (12)
 Install the sense line connector (2).

 (13)
 TORQUE the sense line connector (2) to between 0.95 and 1.05 m.daN

 (84.07 and 92.92 lbf.in).

 (14)
 Remove the blanking cap from the electrical connector (14).

 (15)
 Make sure that the electrical connector is clean and in a correct condition.


 (16) Connect the electrical connector (14). **ON A/C 055-099, 201-299, 301-302,
 Subtask 21-51-51-420-057
 B. Installation of the Air Duct
 (1)
 Remove the protective covers from the air duct assembly.

 (2)
 Clean the component interfaces and/or the adjacent area.

 (3)
 Lubrication of the O-ring WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE


_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES, GOGGLES AND A MASK.
 (a) Apply a small amount of COMMON GREASE (Material No. 04-007) to the o-ring (15).
 NOTE : This is a molybdenum disulfide powder.
____ Before you can apply it you must first make it into a paste. To do this you must mix the powder with pure water or white spirit.
 (4)
 Put a new o-ring (15) in position on the air duct flange.

 (5)
 Put the air duct assembly in its correct position and attach the v-clamps (1) and (3) but do not tighten the clamps.

 (6)
 Put the three support rods (9) in position on the brackets on top of the duct.


 1EFF : 051-099, 201-299, 301-302, 1 21-51-51Page 475 1 1 Aug 01/05R 1 1 1CES 1


 (7)
 Install the bushings (5), the bolts (4), the washers (8) and the nuts (7).

 (8)
 TORQUE the clamp (1) to between 0.4 and 0.5 m.daN (35.39 and 44.24 lbf.in).

 (9)
 TORQUE the clamp (3) to between 0.81 and 0.93 m.daN (71.68 and 82.30 lbf.in).


 (10)
 Put the bonding strap (11) in position and install the bolt (10), the washer (12) and the nut (13) (Ref. TASK 20-28-00-912-004).

 (11)
 Remove the blanking cap from the sense line connector (2).

 (12)
 Install the sense line connector (2).

 (13)
 TORQUE the sense line connector (2) to between 0.95 and 1.05 m.daN


 (84.07 and 92.92 lbf.in). **ON A/C 051-099, 201-299, 301-302,
 Subtask 21-51-51-220-054
 C. Post Installation Measurement and Adjustment
 (1)
 At the sleeve (26):

 -make sure that the dimension X is 160.5 +3.5 -3.5 mm (6.3189 +0.1377 -0.1377 in.).

 (2)
 At the support rod (9):

 -make sure that the dimension V between the support rod (9) and the bracket (22) is 1.2 mm (0.0472 in.) minimum.

 (3)
 If necessary adjust the support-rods to get the correct dimensions V and X:


 NOTE : Normally it is only necessary to adjust the aft support rod.
____
 (a)
 Bend the tab washer (16) away from the lock-nut (17).

 (b)
 Loosen the lock-nut (17).

 (c)
 Remove the rod eye (18) and install a new tab washer (16) on the rod eye thread.

 (d)
 Install the rod eye (18).


 1EFF : 051-099, 201-299, 301-302, 1 21-51-51Page 476 1 1 Aug 01/05R 1 1 1CES 1


 (e)
 Turn the rod eye (18) clockwise or counterclockwise until:

 -
the dimensions V and X are in the correct limits and

 -
the screw (4) can still easily be installed.

 

 (f)
 Make sure that the threads of the rod eyes (18) are deep enough in the support rod (9).


 NOTE : If you cannot push a needle or equivalent through the
____ inspection holes, the rod eyes are deep enough in the support rod.
 (g)
 Tighten the lock-nut (17).

 (h)
 Bend the tab washer (16) to safety the lock-nut (17).


 Subtask 21-51-51-865-062
 D. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
FOR 100HM 49VU AIR COND/FLOW/CTL &/IND1 1HB D07 122VU AIR COND/FLOW/MIXER/FLAP 3HB V22 122VU AIR COND/FLOW/CTL AND IND/2 2HB V21 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(145)