R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 21-51-00-860-053
 C. Aircraft Maintenance Configuration
 (1) Open the avionics-bay access door 811.
 (2) Put a warning notice in position to tell persons not to close the avionics-bay access door 811.
 (3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
 (4) Make sure that the BLEED page is shown on the ECAM lower display unit.
 (5) On the panel 30VU make sure that:
 - the PACK 1 and the PACK 2 pushbutton switches are in the off position (the OFF legends are on),
 - the PACK FLOW selector is in the NORM position and,
 - the HOT AIR pushbutton switch is in the off position (the OFF legend is on). 

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-51-00Page 518 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C 301-399,


 Subtask 21-51-00-860-053-A
 C. Aircraft Maintenance Configuration
 (1)
 Open the avionics-bay access door 811.

 (2)
 Put a warning notice in position to tell persons not to close the avionics-bay access door 811.

 (3)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).

 (4)
 Make sure that the BLEED page is shown on the ECAM lower display unit.

 (5)
 On the panel 30VU make sure that:

 -
the PACK 1 and the PACK 2 pushbutton switches are in the off position (the OFF legends are on),

 -
the ECON FLOW pushbutton switch is in the off position (the ON legend is off) and,

 -
the HOT AIR pushbutton switch is in the off position (the OFF legend is on).

 


 **ON A/C ALL
 Subtask 21-51-00-618-051
 D. Do the pre-conditioning through the HP ground connection (Ref. TASK 12-33-21-618-001).
 4. Procedure
_________
 WARNING : MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE RAM AIR

_______ OUTLETS. HOT EXHAUST GASES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
 1EFF : ALL 1 21-51-00Page 519 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 21-51-00-710-052
 A. Operational Test of the Flow Control Valves Closing
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the panel 30VU:
-
push the PACK 1 and PACK 2 pushbutton switches to the on position.

 -
push the PACK 1 and PACK 2 pushbutton switches to the off position..


5. Close-up
________
 Subtask 21-51-00-860-054On the panel 30VU:
-
the OFF legends on the PACK 1 andPACK 2 pushbutton switches go off.

 On the ECAM lower display unit:

 -
the L and R flow control valve symbols open.

On the panel 30VU:

-
the OFF legends on the PACK 1 andPACK 2 pushbutton switches come on.

 On the ECAM lower display panel:

 -
the L and R flow control valve symbols close.


 A. Aircraft Maintenance Configuration
 (1)
 Stop the pre-conditioning through the HP ground connection (Ref. TASK 12-33-21-618-001).

 (2)
 Do the EIS stop procedure
 (Ref. TASK 31-60-00-860-002).


 (3)
 Remove the warning notice(s).


 (4) Close the avionics-bay access door 811. Subtask 21-51-00-862-052
 B. De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 1EFF : ALL 1 21-51-00Page 520 1 1 Aug 01/05R 1 1 1CES 1


 FLOW CONTROL AND INDICATING - INSPECTION/CHECK
______________________________________________
 TASK 21-51-00-200-001
 Delta P Sense Lines Torque Check and Inspection
 1. Reason for the Job
__________________
 Referenced from TSM
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific Torque Wrench : range 0.00 to 1.20 m.daN

 (0.00 to 9.00 lbf.ft)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection 12-33-21-618-001 Pre-conditioning with the APU 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(108)