____ This will help to prevent damage to the seals in the sleeve (11).
 (12) Install the clamp (31). NOTE : Make sure that the connecting straps (31) are:
____ -not twisted,
 -in a horizontal position,
 -parallel to each other.
 (13)
 TORQUE the clamp (31) to between 0.400 and 0.500 m.daN (35.39 and

 44.24 lbf.in).

 (14)
 Put the bonding strap (19) in position and install the screw (18), the washer (20) and the nut (21) (Ref. TASK 20-28-00-912-004).

 (15)
 Sense Line Installation WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE


_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
 (a)
 Remove the blanking plugs from the disconnected line ends.

 (b)
 Apply a small amount of COMMON GREASE (Material No. 04-014A) to the threads of the union (6).

 (c)
 Install the sense line connector (7) on the union (6).

 (d)
 TORQUE the sense line connector (7) to between 0.95 and 1.05 m.daN (84.07 and 92.92 lbf.in).


R 1EFF : 004-049, 101-105, 151-199, 1 21-51-41Page 421 1 1 May 01/05 1 1 1CES 1

 

R **ON A/C 001-049, 101-105, 151-199,

 Subtask 21-51-41-220-050
 D. Post Installation Measurement and Adjustment
 (1)
 At the sleeve (11):

 -make sure that the dimension X is 160.5 +3.5 -3.5 mm (6.3189 +0.1377 -0.1377 in.).

 (2)
 At the mounting (28):


 -make sure that the dimension V between the mounting (28) and the bracket (27) is 1.2 mm (0.0472 in.) minimum.
 NOTE : You can get the tolerances in work steps (1) and (2) if you
____
 adjust the tie-rod (1).
 You must only adjust the tie-rod (1).
 Safety the tie-rod after you adjust it.

 Subtask 21-51-41-865-052
 E. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
FOR 100HM 49VU AIR COND/FLOW/CTL &/IND1 1HB D07 122VU AIR COND/FLOW/MIXER/FLAP 3HB V22 122VU AIR COND/FLOW/CTL AND IND/2 2HB V21 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
 FOR 101HM 49VU AIR COND/FLOW/CTL &/IND1 1HB D07 122VU AIR COND/FLOW/MIXER/FLAP 3HB V22 122VU AIR COND/FLOW/CTL AND IND/2 2HB V21 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17
R 1EFF : 001-049, 101-105, 151-199, 1 21-51-41Page 422 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 23HH W21 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 24HH Y21 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20
 **ON A/C 001-003,
 Subtask 21-51-41-710-050
 F. Test
 (1)
 Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).

 (2)
 Do a leak check of the ozone filter and sense line connections. NOTE : Leaks are not permitted.

____

 (3)
 After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).

 (4)
 Do the operational test of the pack temperature control system (Ref. TASK 21-61-00-710-001).


R **ON A/C 004-049, 101-105, 151-199,
 Subtask 21-51-41-710-050-A
 F. Test
 (1)
 Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001).

 (2)
 Do a leak check of the ozone filter and sense line connections. NOTE : Leaks are not permitted.

____

 (3)
 After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).


R 1EFF : 001-049, 101-105, 151-199, 1 21-51-41Page 423 1 1 May 01/05 1 1 1CES 1