-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001  Pre-conditioning through the HP Ground Connection 
 12-33-21-618-001  Pre-conditioning with the APU 
 21-51-00-710-002  Operational Test of the Flow Control and Indicating 
 System 
 24-41-00-861-002  Energize the Aircraft Electrical Circuits from the 
 External Power 
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied 
 from the External Power 
 53-35-13-000-002  Removal of the Quick-Release Access Panels from the 
 Belly Fairing Structure 
 53-35-13-400-002  Installation of the Quick-Release Access Panels on 
 the Belly Fairing Structure 
 3. Job Set-up__________ 
 Subtask 21-51-11-860-051
 A. Aircraft Maintenance Configuration
 (1) Make sure that:
 (a)
 The aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
 (b)
 The access panel is removed (Ref. TASK 53-35-13-000-002), FOR 23HB2 191BB, FOR 24HB2 192FB.
R 1EFF : 106-149, 303-399, 401-499, 1 21-51-11Page 423 1 1 Aug 01/05 1 1 1CES 1
 Subtask 21-51-11-865-054 
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged 
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 23HB2  
R  **ON A/C 401-499, 
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  52HH 49HH 51HH 50HH  D08 X22X21Y18  
R  **ON A/C 106-149, 303-399, 401-499, 
 FOR 24HB2  
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20 
R 1EFF : 106-149, 303-399, 401-499, 1 21-51-11Page 424 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 106-149, 303-399, 401-499,
 4. Procedure
_________
 WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA
_______ WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
 Subtask 21-51-11-420-052
 A. Installation of the Pressure Sensor
 (1) Lubrication of the O-rings
 WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING AND RUBBER GLOVES.
 (a) Apply a small amount of COMMON GREASE (Material No. 04-012) to the new O-ring (11) AS3582-015 and the newO-ring (12) AS3582-011.
 (2) Preparation of the Screws
 WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE
_______ THIS/THESE MATERIAL/S. USE PROTECTIVE CLOTHING, RUBBER GLOVES AND GOGGLES.
 (a) Apply a small amount of COMMON GREASE (Material No. 04-014A) to the threads of the screws (1) and (7).
 (3)
 Put the O-rings (11) and (12) in position on the sensor boss (10).
 (4)
 Make sure that the air-transfer holes in the sensor boss (10) are free from grease and other contamination.
 (5)
 Connect the electrical connector (6)
R 1EFF : 106-149, 303-399, 401-499, 1 21-51-11Page 425 1 1 Aug 01/05 1 1 1CES 1
 (6) Put the sensor (5) in position and insert the sensor boss (10) into the sensor mount (13).
 