R 1EFF : 004-049, 055-099, 101-149, 151-199, 1 21-51-00Page 608 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
 Subtask 21-51-00-710-053 
 D. Test 
 (1) Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001). 
 (2) Sense Line Leak Test 
 WARNING : PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO_______ NEAR AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.  
R R  (a) With a soapy water solution, do a leak check of the sense lines (1) and (3) and the sense line connections (2), (4) and (6). 
 NOTE : Leaks are not permitted.____  
R R  (3) After approx. 15 minutes, stop the pre-conditioning (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001). 
 5. Close-up________ 
 Subtask 21-51-00-410-055 
 A. Close Access 
 (1) Make sure that the work area is clean and clear of tool(s) and other items. 
 (2) Install the access panels (Ref. TASK 53-35-13-400-002): FOR 10HB and  
R  (a) FOR 11HB 191KB and 191BB. FOR 8HB and  
R  (b) FOR 9HB 192KB and 191BB. 
 Subtask 21-51-00-862-054 
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002). 
R 1EFF : 004-049, 055-099, 101-149, 151-199, 1 21-51-00Page 609 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
 FLOW CONTROL AND INDICATING - REPAIRS
_____________________________________
 TASK 21-51-00-300-001
 Attachment Components - Repair/Replacement
 WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN
_______ YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15 MINUTES. -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lint free cloth
 1EFF : ALL 1 21-51-00Page 801 1 1 May 01/04R 1 1 1CES 1
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 08-009 USA MIL-R-46082
 PRIMER, ACTIVATOR FOR ANAEROBIC (Ref. 20-31-00)
 Material No. 08-029 USA MIL-R-46082 TYPE I
 ADHESIVE (Ref. 20-31-00)
 Material No. 09-016  USA MIL-PRF-81733D TYPE II CLASS B
 CORROSION INHIBITING FILLET CONSISTENCY
 (Ref. 20-31-00)
 Material No. 11-004  USA MIL-T-81533
 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM)
 (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
7 washer 21-52-03 84 -080 7 washers 21-52-03 84 -080
 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 101-105, 151-199,
 21-51-00-991-004  Fig. 801 
R **ON A/C 051-099, 106-149, 201-299, 301-399, 401-499,
 21-51-00-991-004-A  Fig. 801A **ON A/C ALL
 3. Job Set-up
__________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 3(110)