 B. Do the procedure as in Para. 3. A.

 TASK 21-61-00-810-901


 ECAM Indication only - AIR COND CTL 2-B FAULT
 1. Possible Causes
_______________
 - CONT-AIR COND SYSTEM 2 (57HH)

 - wiring


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
ASM 216101S1 AMM 21-61-34-000-002 Removal of the Air-Conditioning System Controller (47HH, 57HH) AMM 21-61-34-400-002 Installation of the Air-Conditioning System Controller (47HH, 57HH)
 3. Fault Confirmation
__________________
 A. Do a read out of the POST FLIGHT REPORT.
 4. Fault Isolation
_______________
 A. If the POST FLIGHT REPORT shows the warning AIR COND CTL 2-B FAULT
 without any associated maintenance messages:

 (1) Do a check of the wiring (Ref. ASM 216101S1) from,
 - the ACSC2 (57HH/C) pin 2 to the CB (56HH) (28VDC supply) and,

 - the ACSC2 (57HH/C) pin 1 to the CB (54HH) (115VAC supply). If the fault continues:

 - replace the CONT-AIR COND SYSTEM 2 (57HH) (Ref. AMM TASK 21-61-34-000-002) and (Ref. AMM TASK 21-61-34-400-002).


 B. Do the procedure as in Para. 3. A.


R **ON A/C 151-199, 401-499,

 TASK 21-61-00-810-903
 Pack 1 Regulation Fault with Amber XX Bypass Valve Indication
 1. Possible Causes
_______________
 - VALVE-TURBINE BYPASS (10HH)

 - wiring


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 21-61-00-710-001 Operational Test of the Pack Temperature-Control
 System
 AMM 21-61-53-000-001 Removal of the Bypass Valve 10HH (30HH)
 AMM 21-61-53-400-001 Installation of the Bypass Valve 10HH (30HH)
 ASM 21-61/04

 3. Fault Confirmation
__________________
 A. Do the operational test of the pack temperature-control system (Ref. AMM TASK 21-61-00-710-001).
 4. Fault Isolation
_______________
 A. If the test does not confirm the fault:
 (1) Do the reset procedure for the ACSC1 as follows, - open the circuit breakers 49HH, 50HH, 51HH and 52HH.

 - wait for a minimum of 5 seconds.

 - close the circuit breakers 49HH, 50HH, 51HH and 52HH.

 

 (2) No further trouble shooting is necessary.


 B. If on the ECAM BLEED page the pack 1 bypass valve shows AMBER XX:
 - replace the VALVE-TURBINE BYPASS (10HH) (Ref. AMM TASK 21-61-53-000-001) and (Ref. AMM TASK 21-61-53-400-001).
 (1) If the fault continues:
 - do a check and repair the wiring (Ref. ASM 21-61/04) from:

 - the VALVE (10HH) to the ACSC1 (47HH) and,

 - the VALVE (10HH) to ground.


 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 151-199, 401-499, ∞∞21-61-00∞∞∞∞∞∞∞∞∞∞Page B234
 Aug 01/05 CES

 TASK 21-61-00-810-904


 Pack 2 Regulation Fault with Amber XX Bypass Valve Indication
 1. Possible Causes
_______________
 - VALVE-TURBINE BYPASS (30HH)

 - wiring


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 21-61-00-710-001 Operational Test of the Pack Temperature-Control
 System AMM 21-61-53-000-001 Removal of the Bypass Valve 10HH (30HH) AMM 21-61-53-400-001 Installation of the Bypass Valve 10HH (30HH) ASM 21-61/02
 3. Fault Confirmation
__________________
 A. Do the operational test of the pack temperature-control system (Ref. AMM TASK 21-61-00-710-001).
 4. Fault Isolation
_______________
 A. If the test does not confirm the fault:
 (1) Do the reset procedure for the ACSC2 as follows,
 - open the circuit breakers 53HH, 54HH, 55HH and 56HH.


 - wait for a minimum of 5 seconds.

 - close the circuit breakers 53HH, 54HH, 55HH and 56HH.

 

 (2) No further trouble shooting is necessary.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 AIR CONDITIONING 空调2(94)