TASK 21-61-00-810-805
Pack Controller 1 (ACSC1) Fault
1. Possible Causes
_______________
- CONTROLLER-PACK 1 TEMP (7HH)
- CONT-AIR COND SYSTEM 1 (47HH)
- wiring
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
21-61-00-810-820 Pack 1 Electrical Component with Short Circuit (AIR PACK 1 REGUL FAULT) AMM 21-61-00-710-001 Operational Test of the Pack Temperature-Control
System AMM 21-61-34-000-001 Removal of the Pack Controller (7HH, 27HH) AMM 21-61-34-000-002 Removal of the Air-Conditioning System Controller
(47HH, 57HH)
AMM 21-61-34-400-001 Installation of the Pack Controller (7HH, 27HH)
AMM 21-61-34-400-002 Installation of the Air-Conditioning System
Controller (47HH, 57HH)
AMM 32-69-00-740-001 BITE Check Landing Gear Control Interface Unit (LGCIU) using MCDU to Ensure that Continuous BITE is Operative
ASM 21-51/01
ASM 21-61/02
ASM 21-61/03
ASM 21-63/02
3. Fault Confirmation
__________________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
A. Do the operational test of the pack temperature-control system (Ref. AMM TASK 21-61-00-710-001).
NOTE : If a fault is detected, the PC gives a fault code for shop
____ maintenance in addition to the related CFDS message(s) (refer to TSM chapter 21-63-00, page block 301).
R **ON A/C 401-499,
A. Do the operational test of the pack temperature-control system (Ref. AMM TASK 21-61-00-710-001).
**ON A/C ALL
4. Fault Isolation
_______________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
A. If the test gives the maintenance message TEST FAILED with the fault code (6D):
- do a check for a ground signal at the PC 1 (7HH) connector AA/9B (Ref. ASM 21-61/03).
(1) If there is no ground signal:
- do the BITE test of the landing gear (Ref. AMM TASK 32-69-00-740-001).
(a) If the test gives a different maintenance message refer to the Fault Symptom List.
(b) If the fault continues:
- do a check and repair the wiring if necessary between: PC 1 (7HH) connector AA/9B and LGCIU 2 (5GA2) connector AB/G1 (Ref. ASM 21-61/03).
(2) If the fault continues:
- do a check and repair the wiring between: PC 1 (7HH) connector AB/6B and FCV (11HB) connector A/D, PC 1 (7HH) connector AA/1D and FCV (11HB) connector A/E, PC 1 (7HH) connector AA/1C and FCV (11HB) connector A/F, PC 1 (7HH) connector AA/1B and FCV (11HB) connector A/G, PC 1 (7HH) connector AA/1A and FCV (11HB) connector A/V, PC 1 (7HH) connector AA/11C and FCV (11HB) connector A/J, PC 1 (7HH) connector AA/11B and FCV (11HB) connector A/K, PC 1 (7HH) connector AA/11A and FCV (11HB) connector A/L (Ref. ASM 21-51/01).
B. If the test gives the maintenance message P1 CONT:
- replace the CONTROLLER-PACK 1 TEMP (7HH) (Ref. AMM TASK 21-61-34-000-001) and (Ref. AMM TASK 21-61-34-400-001).
(1) If the fault continues:
- do a check and repair the wiring if necessary between: PC 1 (7HH) connector AA/5A and CB (1HH), PC 1 (7HH) connector AA/5B and GND, PC 1 (7HH) connector AB/13D and CB (2HH),
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞21-61-00∞∞∞∞∞∞∞∞∞∞Page 238
Aug 01/05 CES
PC 1 (7HH) connector AB/14A and GND (Ref. ASM 21-61/03).
(2) If the fault continues:
- do a check and repair if necessary the wiring of the signal: ARINC 429 XTR (P) from the ZC (8HK) to the PC 1 (7HH), ARINC 429 XTR (S) from the ZC (8HK) to the PC 1 (7HH), ARINC 429 RCV (S) from the ZC (8HK) to the PC 1 (7HH) (Ref. ASM 21-63/02).
(3) If the fault continues:
- do the trouble shooting procedures for the pack 1 electrical component with short circuit (Ref. TASK 21-61-00-810-820).
R **ON A/C 401-499,
B. If the test gives the maintenance message ACSC1 (47HH):
- replace the CONT-AIR COND SYSTEM 1 (47HH) (Ref. AMM TASK 21-61-34-000-002) and (Ref. AMM TASK 21-61-34-400-002).
(1) If the fault continues:
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 AIR CONDITIONING 空调2(27)