• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 22:11来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


20-42-21 Page 4

R Solder Sleeves - P/N Characteristics and Shrinking Tools E0160 Figure 003


20-42-21 Page 520-42-21 Page 6

R  C. NSA937790 
R  (1) Characteristics 
R  (a) P/N identification 

R  NSA937790 - 03 
R  | |-------------------------- Size code 
R  | 
R  |----------------------------------- Standard P/N 
R  (b) Temperature 
R  Maximum operating temperature is 260 deg.C (500.00 deg.F). 
R  Only use this temperature on nickel-plated braided cables which 
R  can be continously used at 200 deg.C (392.00 deg.F) or more and 
R  at 400 deg.C (752.00 deg.F) for a period of 10 minutes minimum. 
R  (2) Installation 
R  (a) Wire stripping 
R  Refer to Method A or D Procedure. 
R  (b) Shrinking tools 
R  (Ref. Fig. 004) 
R  (c) Procedure 
R  Refer to Method A or D Procedure.
 ____________________________________________3. Wire Stripping Procedure (method "A" to "G")
 A. Method "A" (Ref. Fig. : Method "A")
 (1) Strip the bonding wire to the length A (detail A1)
 (2) Make a circular cut at a distance L (detail A1).
 (3) Remove the insulation.
 (4) Unwind the braid (detail A2).
 (5) Cut the braid to get the length B (detail A3).
 B. Method "B" (Ref. Fig. : Method "B")
 (1) Strip the bonding wire to the length A (detail B1)
 (2) Make a circular cut at a distance L (detail B1).

 


R Solder Sleeves - P/N Characteristics and Shrinking Tools NSA937790 Figure 004


20-42-21 Page 7

 (3)
 Remove the insulation.

 (4)
 Cut and remove the braid (detail B2).

 (5)
 Make a circular cut at a distance C (detail B2).

 (6)
 Move the external insulation to get the length B (detail B3).


 C. Method "C" (Ref. Fig. : Method "C")
 (1)
 Strip the bonding wire to the length A (detail C1)

 (2)
 Make a circular cut at a distance L (detail C1).

 (3)
 Remove the cable insulation.

 (4)
 Cut and remove the braid to get the length B (detail C2).


 D. Method "D" (Ref. Fig. : Method "D")
 (1)
 Strip the bonding wire to the length A (detail D1)

 (2)
 Make a circular cut at a distance L (detail D1).

 (3)
 Remove the insulation.

 (4)
 Cut and remove the braid to get the length B (detail D2).

 (5)
 Move the braid rearward on the insulation (detail D3).


 E. Method "E" (Ref. Fig. : Method "E")
 (1)
 Strip the bonding wire to the length A (detail E1)

 (2)
 Make three circular cuts to get the dimension L (detail E1).

 (3)
 Make a longitudinal cut and remove the insulation (detail E2).


 F. Method "F" (Ref. Fig. : Method "F")
 (1)
 Strip the bonding wire to the length A (detail F1)

 (2)
 If necessary, install the rear mount connector on the wire (detail F2).

 (3)
 Install the shrinkable sleeve on the wire (detail F2).

 

20-42-21 Page 8
 Apr 01/05
R


 (4)
 Install the ferrule on the wire (detail F2).

 (5)
 Cut and remove the insulation and the braid to get the dimension L (detail F3).

 (6)
 Unwind the polyimide tape (detail F3).

 (7)
 Remove the packing (detail F3).

 (8)
 Make a circular cut at a distance C (detail F3).

 (9)
 Move the external insulation to get the dimension D (detail F4).


 (10)
 Wires HG are made with UD and XM wires.
 To install solder sleeves for these wires refer to :


 -
Method "A" for UD wire

 -
Method "C" for XM wire.

 

 G.
 Method "G" (Ref. Fig. : Method "G")

 (1)
 Strip the bonding wires to the lengths A and B (detail G1).

 (2)
 Cut the insulation and the braid to get the different dimensions (detail G1).

 

 

20-42-21 Page 9
 Apr 01/05
R


R  _____________________________________________4. Installation Procedure (method "A" to "G") |p 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 ESPM Electrical Standard Practices Manual 2(92)