R  EFF : 001-049, 101-105, 107-107, 151-199, 49-12-52Page 402 201-210, Config-2 Aug 01/05
 CES  Subtask 49-12-52-865-057


 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-12-52-010-052
 C. Get Access
 (1)
 Put the access platform below the access doors 315AL and 316AR.

 (2)
 Open or remove the APU access doors (Ref. TASK 52-41-00-010-001) 315AL, 316AR (Ref. TASK 52-41-21-000-001) (Ref. TASK 52-41-22-000-001).

 (3)
 Set the LIGHT SW 11LJ to the ON position.


 4. Procedure
_________
 **ON A/C 001-049, 101-105, 201-203,

 (Ref. Fig. 401/TASK 49-12-52-991-003) R **ON A/C 107-107, 151-199, 204-210,
 (Ref. Fig. 401A/TASK 49-12-52-991-003-A)
 **ON A/C 001-049, 101-105, 201-203,

 Subtask 49-12-52-020-052
 A. Removal of the Vibration Isolator
 (1)
 Install the HOIST - MINILIFT (Ref. TASK 49-00-00-480-003).

 (2)
 Slowly wind the handle on the APU hoist until the APU hoist-cable is in tension.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-12-52Page 403 201-210, Config-2 Aug 01/05
 CES


 FWD RH Tie-Rods and Vibration Isolator
 Figure 401/TASK 49-12-52-991-003

 CES


 FWD RH Tie-Rods and Vibration Isolator
 Figure 401A/TASK 49-12-52-991-003-A

 CES


 (3)
 Remove the nut (15) and install the PROTECTOR - THREADS, APU MOUNTING


 BOLTS on the cone bolt.

 (4)
 Remove and discard the cotter pins (3) and (11).

 (5)
 Remove the castle nuts (2) and (13), the washers (1) and (12) and the bolts (5)) and (17).

 (6)
 Remove the tie-rods (4) and (6) from the vibration isolator.

 (7)
 Remove the vibration isolator (16) from the APU mount-bracket (14).

 (8)
 If necessary remove the tie-rods (4) and/or (6).

 (a)
 Remove the nuts (9), the washers (8) and the screws (7).

 (b)
 Disconnect the bonding straps (10).

 (c)
 Remove and discard the cotter pins (21).

 (d)
 Remove the castle nuts (20), the washers (19) and the bolts (18).

 


 (e) Remove the tie-rods (4) and/or (6). R **ON A/C 107-107, 151-199, 204-210,
 Subtask 49-12-52-020-052-A
 A. Removal of the Vibration Isolator
 (1)
 Slowly wind the handle on the APU hoist until the APU hoist-cable is in tension.

 (2)
 Remove the nut (15) and install the PROTECTOR - THREADS, APU MOUNTING BOLTS on the cone bolt.

 (3)
 Remove and discard the cotter pins (3) and (11).

 (4)
 Remove the castle nuts (2)) and (13), the washers (1) and (12) and the bolts (5) and (17).

 (5)
 Remove the tie-rods (4) and (6) from the vibration isolator.

 (6)
 Remove the vibration isolator (16) from the APU mount-bracket (14).

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-12-52Page 406 201-210, Config-2 Aug 01/05
 CES  (7) If necessary remove the tie-rods (4) and/or (6).


 (a)
 Remove the nuts (9), the washers (8) and the screws (7).

 (b)
 Remove the nuts (25), the washers (23) and the screws (22).

 (c)
 Remove the clamps (26) and (27) and the bonding strap (24) from the tie-rod (4).

 (d)
 Disconnect the bonding straps (10).

 (e)
 Remove and discard the cotter pins (21).

 (f)
 Remove the castle nuts (20), the washers (19) and the bolts (18).

 (g)
 Remove the tie-rods (4) and/or (6).

 

 

R  **ON A/C 001-049, 101-105, 107-107, 151-199, 201-210,
 TASK 49-12-52-400-003
 Installation of the FWD RH Tie-Rods and Vibration Isolator 4045KM (131-9(A))
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific fiber-bristled brush
 