(a)
Remove the nuts (19), the washers (21) and the screws (22).
(b)
Disconnect the bonding straps (20).
(c)
Remove and discard the cotter pins (18).
(d)
Remove the castle nuts (17), the washers (16) and the bolts (15).
(e)
Remove the tie-rod from the bracket.
R **ON A/C 062-099, 401-499,
Subtask 49-12-51-020-050-A
B. Removal of the Vibration Isolator (4035KM)
(1)
Slowly wind the handle on the APU hoist until the APU hoist-cable is in tension.
(2)
Remove the nut (13) and install the PROTECTOR - THREADS, APU MOUNTING BOLTS on the cone bolt.
(3)
Remove and discard the cotter pins (1) and (7).
(4)
Remove the castle nuts (2) and (6), the washers (3) and (8) and the bolts (4) and (9).
(5)
Remove the tie-rods (5), (10) and (11) from the vibration isolator 4035KM (12).
(6)
Remove the vibration isolator (12) from the APU mount-bracket (14).
(7)
If necessary remove the tie-rods (5), (10) and (11).
(a)
Remove the nuts (19) and (23), the washers (21) and (25) the screws (22) and (26).
(b)
Remove the clamps (27) and (28).
(c)
Disconnect the bonding straps (20).
(d)
Remove and discard the cotter pins (18).
(e)
Remove the castle nuts (17), the washers (16) and the bolts (15).
(f) Remove the tie-rod from the bracket. R **ON A/C 001-003, 051-099, 401-499,
5. Close-up
________ TASK 49-12-51-400-001
Installation of the FWD LH Tie-Rods and Vibration Isolator 4035KM (GTCP 36-300)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific fiber-bristled brush No specific access platform 3.0 m (9 ft. 10 in.) No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00
to 26.00 lbf.ft) 98A49107504001 1 PROTECTOR - THREADS, APU MOUNTING BOLTS
B.
Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
Material No. 05-027 USA MIL-L-81309 RUST INHIBITOR(FOR CORROSION USE 15-004) (Ref. 20-31-00)
Material No. 11-001 USA MIL-D-16791 TYPE I DETERGENT (Ref. 20-31-00)
C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
1 cotter pins 49-12-04 02 -110
1 cotter pins 49-12-04 02A-110
7 cotter pins 49-12-04 02 -120
7 cotter pins 49-12-04 02A-120
18 cotter pin 49-12-04 02 -110
18 cotter pin 49-12-04 02A-110
D. Referenced Information
------------------REFERENCE -------------------------------DESIGNATION ------------------------------
-------------------------------------------------------------------------------
20-28-00-912-004 Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
49-00-00-080-002 Removal of the APU Hoist Tool (GTCP 36-300)
52-41-00-010-001 Open the APU Doors for Access
52-41-00-410-001 Close the APU Doors after Access
52-41-21-000-001 Removal of the APU Access Door 315AL
52-41-22-000-001 Removal of the APU Access Door 316AR and the related
Door Mechanism
**ON A/C 001-003, 051-061,
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2(80)