 NOTE : The installation of the APU is also possible without a removal
____ of the access doors. However, a removal of the doors will:
 -
make the access to the APU compartment better.

 -
make the installation and use of the hoist tool easier.


 -
reduce the risk of injury to the personnel.

 -
reduce the risk of damaging the doors with the maintenance platform.


 (3)
 Make sure that the LIGHT SW 11LJ is set to ON.

 (4)
 Make sure that the:


 -the oil-cooler outlet duct is removed (Ref. TASK 49-52-41-000-003).
 -exhaust muffler is disconnected and moved rearwards.
 -the APU fuel line is drained corrcectly.
 NOTE : If installed, remove the components of the kit for the FLIGHT
____
 WITHOUT APU

 4. Procedure
_________
 Subtask 49-11-11-560-054
 A. Preparation of a Replacement Component
 (1) Make sure that the APU is installed on a SUPPORT FRAME - APU.
 (a) Make sure that the generator is installed correctly (Ref. TASK 24-23-51-400-001).

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-11-11Page 430 201-210, Config-2 Aug 01/05
 CES


 (b)
 Make sure that the FWD and AFT APU mount brackets (46) are installed correctly.(Ref. TASK 49-12-54-400-003).

 (c)
 Make sure the APU LP switch is installed correctly (Ref. TASK 28-22-14-400-001).


 NOTE : Make sure that the parts retained from the removed
____ component are clean and in the correct condition.
 (2) Make sure that the PROTECTOR - THREADS, APU MOUNTING BOLTS are installed on the thread of the AFT APU mount bracket (42).
 (3) Fill the APU oil reservoir (Ref. TASK 49-90-00-600-007).
 **ON A/C 001-049, 101-105, 201-203,

 Subtask 49-11-11-210-066
 B. Preparation for Installation
 (1)
 Make sure the APU compartment is in the correct condition. If necessary clean the APU compartment with CLEANING AGENTS (Material No. 11-001) and a fiber-bristled brush.

 (2)
 Make sure that the nuts (45), (46) and (48) are in a correct condition .


R  NOTE : Obey the para. 3.A.(4) 'Installation of used Bolts and Nuts'
____ R (Ref. TASK 20-21-11-911-001).
 (3)
 Make sure that the PROTECTOR - THREADS, APU MOUNTING BOLTS are installed on the threads (44) of the FWD APU mount vibration isolators.

 (4)
 Examine the connection flanges and attachments of the bleed-air duct.

 (5)
 Examine the exhaust v-clamp and hot nozzle assembly (Ref. TASK 49-81-00-200-008).

 (6)
 Examine the bellows and sealing ring (Ref. TASK 49-81-00-200-010).

 (7)
 Examine the exhaust muffler (Ref. TASK 49-81-00-200-009).

 (8)
 Examine the exhaust duct felt-metal and replace if necessary (Ref. TASK 49-81-41-000-003) and (Ref. TASK 49-81-41-400-003)

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-11-11Page 431 201-210, Config-2 Aug 01/05
 CES


 (9) Examine the drain tank for leaks, dents, chafing and cracks. If
 necessary replace the drain tank (Ref. TASK 49-17-41-000-003) and
 (Ref. TASK 49-17-41-400-003).

 (10)
 Examine the drain tubes and hoses between the spring adapters and the drain mast. Replace porous hoses and/or bent, kinked, holed or leaking tubes.

 (11)
 Examine the support assembly of the oil-cooler outlet-duct attachment. If necessary remove (Ref. TASK 49-52-41-000-003) and install a new support assembly (Ref. TASK 49-52-41-400-003).

 (12)
 Make sure that the threads of the vent and drain valve (21) are clean and in a correct condition.

 (13)
 Make sure that the:

 -electrical cables of the APU starter motor
 -ring terminals of the starter motor cables
 are clean and in a correct condition.


 (14)
 Make sure that the:

 -phase leads of the APU generator
 -ring terminals of the APU generator phase leads
 are clean and in a correct condition.


 (15)
 Put the SUPPORT FRAME - APU (with the APU temporarily installed on it) in the correct position below the APU compartment.

 (16)
 Make sure that the HOIST - MINILIFT is installed correctly (Ref. TASK 49-00-00-480-003).

 (17)
 Remove the blanking covers from APU exhaust and hot-nozzle assy-flange.

 (18)
 Make sure that the hot-nozzle assy-flange is in the temporary position to which it was moved during APU removal.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2(46)