• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (b)
 Attach the rear APU mount-bracket (31) to the APU with the bolts (30).

 (c)
 TORQUE the bolts (30) to between 2.6 and 3.0 m.daN (19.17 and

 22.12 lbf.ft).

 (d)
 Safety the bolts (30) with lockwire-corrosion resistant steel

 0.63 mm (0.0248 in.).

 (e)
 Put the rear vibration isolator (23) in position on the rear APU mount-bracket (31).

 (f)
 Remove the thread protector and install the rear APU mount-nut (29). Do not tighten the nut at this step of the procedure.

 (g)
 Connect the rear vibration isolator (23) to the tie-rods (28) and (22).

 

 


 1_ Align the rear left tie-rod (28) with the rear vibration
 isolator (23) and insert the bolts (27).
 2_ Install the washers (26) and the nuts (25) to the bolts (27).
 3_ TORQUE the nuts (25) to between 0.3 and 0.35 m.daN (26.54 and
 30.97 lbf.in).
 4_ Safety the nuts (25) with the cotter pin (24).
 5_ Align the rear right tie-rod (22) with the rear vibration
 isolator (23) and insert the bolt (21). 

 

 6_ Install the washer (20) and the nut (19) to the bolt (21).
 7_ TORQUE the nut (19) to between 0.55 and 0.75 m.daN (48.67 and
 66.37 lbf.in).
 8_ Safety the nut (19) with the cotter pin (18).
 9_ Hold the rear vibration isolator (23) to prevent movement and
 TORQUE the rear APU mount nut (29) to between 7.7 and 8.5
 m.daN (56.78 and 62.68 lbf.ft).

 Subtask 49-12-54-080-050
 C. Remove the APU hoist (Ref. TASK 49-00-00-080-002) Subtask 49-12-54-420-053
 D. Apply a thin layer of SPECIAL MATERIALS (Material No. 05-027) to the rear vibration isolator (23).
 5. Close-up
________ Subtask 49-12-54-865-052
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.
 Subtask 49-12-54-410-050
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Set the light switch 11LJ to off.

 (3)
 Close the APU access doors 316AR, 315AL (Ref. TASK 52-41-00-410-001) .

 (4)
 Remove the access platform(s).

 


 Subtask 49-12-54-860-055
 C. Aircraft Maintenance Configuration.
 (1)
 De-energize the ground service network (Ref. TASK 24-41-00-862-002)

 (2)
 Remove the warning notice(s).

 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 


 BRACKETS - APU MOUNT - REMOVAL/INSTALLATION
___________________________________________ TASK 49-12-54-000-003 Removal of the APU Mount Brackets (4065KM, 4075KM, 4085KM) (131-9(A)) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP PIN WHEN YOU
_______ OPEN THE ACCESS DOOR. THIS WILL PREVENT INJURY.
 CAUTION : DO NOT REMOVE MORE THAN ONE APU MOUNT AT A TIME WHEN THE APU IS
_______ INSTALLED. THE APU HOIST AND THE REMAINING TWO MOUNTS MUST SUPPORT THE APU WHEN YOU REMOVE AN APU MOUNT.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.5 m (11 ft. 6 in.)
 A1-91-265 1 HOIST - MINILIFT
 98A49107504001 1 PROTECTOR - THREADS, APU MOUNTING BOLTS

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 11-001  USA MIL-D-16791 TYPE I DETERGENT (Ref. 20-31-00)

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-12-54Page 401 201-210, Config-2 Aug 01/05
 CES  C. Referenced Information


 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2(112)