(2)
Remove and discard the cable-tie which holds the electrical connector 7527VC-A to the service frame.
(3)
Remove the blanking cap from the electrical connector 7527VC-A.
(4)
Make sure that the electrical connectors are clean and in the correct condition.
(5)
Connect the electrical connector 7527VC-A to the connector 7527VC. Subtask 49-16-00-865-061
B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-16-00-440-051
C. Reactivation of the Air Intake Flap
(1)
Do the trouble shooting procedure for the air intake flap-actuator 4015KM (Ref.TSM 49).
(2)
Do the inspection of the air intake system (Ref. TASK 49-16-00-210-001).
(3)
Remove the warning notice from the cockpit.
(4)
Make an entry in the logbook to show that the air intake flap is reactivated.
5. Close-up
________ Subtask 49-16-00-860-067
A. Close Access
(1)
Put the catwalk panel in position on the service frame and secure with the fasteners.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Close the maintenance door 314AR.
(4)
Remove the access platform(s).
AIR INTAKE SYSTEM ((GTCP 36-300)) - ADJUSTMENT/TEST
___________________________________________________ R **ON A/C 001-003, 051-099, 401-499,
TASK 49-16-00-710-001 Operational Test of the Air Intake and Diverter (GTCP 36-300) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
1.
Reason for the Job
__________________
Refer to the MPD TASK: 491600-02
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 31-60-00-860-001 EIS Start Procedure 49-16-43-400-001 Installation of the Air Intake Flap (GTCP 36-300) 49-16-00-991-001 Fig. 501
3. Job Set-up
__________ Subtask 49-16-00-860-055
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(2)
Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
Subtask 49-16-00-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU APU/FUEL/BLOW OFF/PUMP 2QC B14 121VU APU/FUEL/BLOW OFF/CTL 1QC K39 121VU APU/FUEL/LP VALVE/CTL 1QF M40 121VU APU/FUEL/LP VALVE/SPLY 2QF M39 121VU APU/FUEL/PUMP/CTL 3QC M38
Subtask 49-16-00-865-052
C. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-16-00-010-061
D. Get Access
(1)
Put the access platform below the APU access doors 315AL and 316AR.
(2)
Make sure that the APU intake blanking plug is removed.
(3)
Make sure that the work area is clean and clear of tool(s) and other items.
NOTE : Open the circuit breakers 1KD and 2KD if adjustments are
____
necessary.