 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
20-28-00-912-002 Electrical Bonding of Components With Conductive Bolts and Screws in the Tanks 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 49-00-00-080-002 Removal of the APU Hoist Tool (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 52-41-21-000-001 Removal of the APU Access Door 315AL 52-41-22-000-001 Removal of the APU Access Door 316AR and the related
 Door Mechanism
 **ON A/C 001-003, 051-061,
 49-12-54-991-001 Fig. 401
R **ON A/C 062-099, 401-499,
 49-12-54-991-001-A Fig. 401A
R **ON A/C 001-003, 051-099, 401-499,
 49-12-54-991-002 Fig. 402  3. Job Set-up


__________
 Subtask 49-12-54-860-054

 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the warning notices is on panel 25VU to tell persons not to start the APU.

 (2)
 Make sure that the ground service network is energized (Ref. TASK 24-41-00-861-002).

 (3)
 Make sure that the hydraulic systems are depressurized (Ref. TASK 29-00-00-864-001).

 (4)
 Make sure that the access platform is in position below the access doors 315AL and 316AR.

 (5)
 Make sure that the APU access doors 315AL, 316AR are open (Ref. TASK 52-41-00-010-001) or removed (Ref. TASK 52-41-21-000-001) and (Ref. TASK 52-41-22-000-001).


 (6)
 Make sure that the light switch 11LJ is set to on.
 Subtask 49-12-54-865-051


 B.
 Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 4. Procedure
_________
 **ON A/C 001-003, 051-061,

 (Ref. Fig. 401/TASK 49-12-54-991-001) R **ON A/C 062-099, 401-499,
 (Ref. Fig. 401A/TASK 49-12-54-991-001-A) R **ON A/C 001-003, 051-099, 401-499,


 (Ref. Fig. 402/TASK 49-12-54-991-002)
 Subtask 49-12-54-210-050

 A. Clean the rear APU mount-bracket with CLEANING AGENTS (Material No. 11-001).
 (1)
 Do a visual inspection of the rear APU mount-bracket for damage:

 (2)
 Make sure that the bolt holes of the bracket are not elongated.

 (3)
 Make sure that the surface finish of the tapered shaft is not scratched, scored or burred.

 (4)
 Make sure that the thread in the bracket, for the setscrew is not damaged.

 (5)
 Make sure that the flange is not bent.

 (6)
 Make sure that there are no cracks in the rear APU mount-bracket. If you think there is a crack, do a dye-penetrant inspection.

 (7)
 Install the PROTECTOR - THREADS, APU MOUNTING BOLTS to the rear APU mount.


 Subtask 49-12-54-420-050
 B. Installation of the APU Mount Brackets
 (1)
 Install the FWD left and the FWD right APU mount-brackets.

 (a)
 Carefully put the FWD APU mount bracket (17) in position on the vibration isolator and the APU. Make sure that the spigot is correctly engaged in the APU.

 (b)
 Attach the FWD APU mount-bracket (17) to the APU with the bolts (10).

 (c)
 TORQUE the bolts (10) to between 2.6 and 3.0 m.daN (19.17 and

 22.12 lbf.ft).

 (d)
 Remove the thread protector and install the FWD APU mount-nut (16).

 (e)
 TORQUE the FWD APU mount-nut (16) to between 2.5 and 3.1 m.daN

 (18.43 and 22.86 lbf.ft)

 (f)
 Install the setscrew (15) in the FWD APU mount-bracket (17) and lock it in position with the nut (14).

 (g)
 Attach the bonding strap (13) to the setscrew (15) with the washer (12) and the nut (11) (Ref. TASK 20-28-00-912-002).

 (h)
 Safety the bolts (10) with lockwire-corrosion resistant steel


 0.63 mm (0.0248 in.) dia..

 (2)
 Install the rear APU mount-bracket.

 (a)
 Carefully put the rear APU mount bracket (31) in position on the APU.
 