 Subtask 49-11-00-860-078
 C. Aircraft Maintenance Configuration
 (1)
 De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).


 (2)
 Pressurize the reservoirs of the hydraulic systems.
 (Ref. TASK 29-14-00-614-002).


 (3)
 Make an entry in the technical logbook.

 (4)
 Remove the warning notice(s).

 


 TASK 49-11-00-350-002
 Repair of the Turbine Plenum Insulation Blanket (GTCP 36-300)
 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 WARNING : LOCK THE MECHANISM OF THE ACCESS DOOR 316AR WITH THE PIP PIN WHEN YOU
_______ OPEN THE ACCESS DOOR. THIS WILL PREVENT INJURY.
 CAUTION : MAKE SURE THAT YOU HAVE THE CORRECT FIRE FIGHTING EQUIPMENT
_______ AVAILABLE. THE APU FIRE EXTINGUISHING SYSTEM IS NOT SUFFICIENT TO EXTINGUISH A FIRE IF THE ACCESS DOORS 315AL AND 316AR ARE OPEN/ REMOVED. KEEP OPERATION OF THE APU TO A MINIMUM WHEN THE ACCESS DOORS ARE OPEN/REMOVED.
 CAUTION : MAKE SURE THAT THE FUEL-FEED SYSTEM DOES NOT HAVE ANY LEAKS. LEAKS IN
_______ THE FUEL-FEED SYSTEM CAN CAUSE A FIRE.
 1. Reason for the Job
__________________
 A.
 A number of incidences of rubber surge duct separations have occured which
 in some cases has resulted in damage to the turbine-plenum
 insulation-blankets.

 B.
 The rubber duct separations direct the high velocity load-control
 discharge-air over the external surge-duct portion of the turbine plenum. In
 some cases this results in localized damage to the insulation blanket. With
 the APU inlet temperature above 125 deg.F (51.66 deg.C) the exposed skin
 temperature may exceed a 450 deg.F (232.22 deg.C) specification limit
 established during aircraft certification.

 C.
 This repair authorizes the modification of the existing damaged plenum
 blanket P/N 3846330-10 to allow the incorporation of the P/N 3846643-1
 repair blanket. In addition, this repair provides instructions for the
 replacement of the plenum surge blanket P/N 3846330-2 as necessary.

 2. Job Set-up Information
______________________
 Not Applicable
 3.
 Job Set-up

 4.
 Procedure

_________

 5.
 Close-up


__________ ________


 Subtask 49-11-00-865-075
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41


 POWER PLANT ((131-9(A))) - REPAIRS
__________________________________ TASK 49-11-00-400-005 Installation of the APU Substitution Kit (131-9(A)) WARNING : ISOLATE THE ELECTRICAL CIRCUITS FROM THE RELATED EQUIPMENT AND THE
_______ ENVIRONMENT.
 WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______ WHEN YOU DO THE MAINTENANCE TASK(S).
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific blanking plug
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 06-001A  USA MIL-L-23398 SOLID FILM LUBRICANT AIR DRYING (Ref. 20-31-00)
 Material No. 19-010  USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-11-00Page 801 201-210, Config-2 Aug 01/05
 CES


 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2(5)