• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Make sure that the light switch 11LJ is set to on. Subtask 49-12-53-865-051

 B.
 Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 4. Procedure
_________
 (Ref. Fig. 401/TASK 49-12-53-991-001) Subtask 49-12-53-210-054
 A. Preparation for Installation
 (1)
 Clean the tie-rods (12) and (13) and the vibration isolator (10) with solvent CLEANING AGENTS (Material No. 11-001) and a fiber-bristled brush.

 (2)
 Do a check and make sure that the tie-rods (12) and (13) are in correct condition.

 (3)
 If the tie-rods and/or the vibration isolator are damaged, replace them if necessary.

 (4)
 Clean and examine the attachment brackets, the APU mount-bracket (11) and the structure for damage and replace if nescessary.

 


 Subtask 49-12-53-420-050
 B. Installation of the Aft Vibration Isolator (4055KM)
 (1) Protective Treatment
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (a) Apply SPECIAL MATERIALS (Material No. 05-002) to all the mating surfaces. Do not apply it to the bonding straps.
 (2)
 Install the vibration isolator (4055KM) (10) on the APU mount-bracket (4085KM) (11).

 (3)
 If removed install the tie-rods (12) and (13).

 (a)
 Install the bolts (21), the washers (18) and the castle nuts (19).

 (b)
 Tighten and TORQUE the castle nuts (19) to between to between

 0.55 and 0.75 m.daN (48.67 and 66.37 lbf.in) and safety them with the new cotter pin (20).

 (c)
 Connect the bonding straps (15) to the bonding bracket (Ref. TASK 20-28-00-912-004).

 (d)
 Install the screws (16), the washers (17) and the nuts (14).

 (e)
 Tighten and TORQUE the nuts (14) to between to between 0.22 and


 0.26 m.daN (19.46 and 23.00 lbf.in).

 (4)
 Install the tie-rods (12) and (13) at the vibration isolator.

 (5)
 Install the bolts (4) and (8), the washers (1) and (7) and the castle nuts (2) and (6).

 (6)
 Tighten and TORQUE the castle nuts

 -
item (2) to between to between 0.55 and 0.75 m.daN (48.67 and 66.37 lbf.in)

 -
item (6) to between to between 0.3 and 0.35 m.daN (26.54 and 30.97

 

 


 lbf.in) and safety them with the new cotter pin (3) and cotterpin (5).
 (7)
 Tighten and TORQUE the castle nuts (15) to between 0.3 and 0.35 m.daN

 (26.54 and 30.97 lbf.in) and safety them with the new cotter pin (16).

 (8)
 Tighten and TORQUE the castle nuts (2) to between 0.55 and 0.75 m.daN

 (48.67 and 66.37 lbf.in) and the castle nut (18) to between 0.55 and
 0.75 m.daN (48.67 and 66.37 lbf.in) and safety them with the new cotter pin (1).

 (9)
 Remove the PROTECTOR - THREADS, APU MOUNTING BOLTS and install the nut (12).


 (10)
 Tighten and TORQUE the nut (12) to between 7.7 and 8.5 m.daN (56.78 and 62.68 lbf.ft)

 (11)
 Connect the bonding straps (8) to the brackets (Ref. TASK 20-28-00-912-004).

 (12)
 Install the screws (7), the washers (6) and the nuts (5).

 (13)
 Tighten and TORQUE the nuts (5) to between 0.22 and 0.26 m.daN (19.46 and 23.00 lbf.in).


 Subtask 49-12-53-080-050
 C. Remove the APU hoist (Ref. TASK 49-00-00-080-002)
 Subtask 49-12-53-420-055
 D. Apply a thin layer of SPECIAL MATERIALS (Material No. 05-027) to the vibration isolator (10), the tie-rod ends, the suspension structural brackets and the APU mount-bracket.
 5. Close-up
________
 Subtask 49-12-53-865-052
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.


 Subtask 49-12-53-410-050
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Set the light switch 11LJ to off.

 (3)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2(102)