 NOTE : If the breakaway torque of the LH (47) or RH FWD nut
____
 (48) is less than to 0.1 m.daN (8.84 lbf.in), replace
 the nut.
 If the breakaway torque of the AFT nut (50) is less
 than to 0.2 m.daN (17.69 lbf.in), replace the nut.

 3  Turn the nuts (47), (48) and (50) until they are in contact
_ with the APU mount brackets or vibration isolator.
 4  TORQUE the LH (47) and the RH (48) nuts to between 2.5 and 3.1
_ m.daN (18.43 and 22.86 lbf.ft)
 5  TORQUE the aft nut (50) to between 7.7 and 8.5 m.daN (56.78
_
 and 62.68 lbf.ft)

 6  Mark the nuts with red locking varnish to identify the torqued
_
 position.

 (e) Do a visual check of the FWD LH vibration isolator, FWD RH vibration isolator and AFT vibration isolator.

R  **ON A/C 001-049, 101-105, 107-107, 151-199, 201-210,
 Subtask 49-11-11-080-055
 D. Removal of the HOIST - MINILIFT CAUTION : MAKE SURE THAT THE THREE ATTACHMENT NUTS ARE INSTALLED AND
_______ CORRECTLY TORQUED BEFORE YOU DISCONNECT THE HOIST. IF YOU DO NOT DO THIS, YOU CAN CAUSE DAMAGE TO THE TIE RODS.
 NOTE : Removal the Hoist - Minilift carefully. If you do not, you can
____ cause damage to the Exit-Fan Duct Assembly of the Oil Cooler.
 (1) Remove the HOIST - MINILIFT from the APU compartment (Ref. TASK 49-00-00-080-003).

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-11-11Page 438 201-210, Config-2 Aug 01/05
 CES R **ON A/C 001-049, 101-105, 201-203,


 Subtask 49-11-11-420-061
 E. Connection of the APU
 (1)
 Connection of the Bonding Straps
 (Ref. Fig. 404/TASK 49-11-11-991-011)


 (a)
 Remove and discard the tape which temporarily attached the bonding straps (41) to the mount bracket (46).

 (b)
 Remove the temporarily installed nuts (43), washers (42) from the FWD LH and FWD RH stud (40) on the mount bracket (46).

 (c)
 Connect the bonding straps (41) with the stud (40), the nuts (43) and washers (42) to the FWD LH and FWD RH mount brackets (46) (Ref. TASK 20-28-00-912-004).

 

 (2)
 Connection of the Exhaust Muffler
 (Ref. Fig. 401/TASK 49-11-11-991-010)


 (a)
 Make sure that the APU exhaust and the exhaust muffler are free and clear of unwanted materials.

 (b)
 Push the exhaust muffler forward until the hot nozzle assy (32) flange touches the APU exhaust flange.

 (c)
 Make sure that the drain outlet on the hot nozzle assy (31) is at the 6 o'clock position.

 (d)
 Adjust the flange of the hot nozzle assy radially to the APU exhaust flange.

 


 NOTE : Before the clamp is installed, the offset around should
____ not be more than 0 +4 -4 mm (0.0000 +0.1574 -0.1574 in.).
 (e) Install the exhaust coupling clamp (30) with the lockbolts in the 3 and 9 o'clock position.
 NOTE : Make sure that the exhaust coupling clamp (30) is engaged
____
 equally.

 (f)
 TORQUE the lockbolts of the exhaust coupling clamp (30) equally to between 0.81 and 0.93 m.daN (71.68 and 82.30 lbf.in).

 (g)
 Install the two halves of the insulation blanket (33) and (34) in position at the exhaust coupling clamp (30), connect the two halves with MISCELLANEOUS (Material No. 19-010).

 (h)
 Connect the two halves of the insulation blanket (33) and (34) with lockwire corrosion-resistant steel 0.8 mm (0.032 in.) dia. to the studs on the hot nozzle assy (31).

 


 (3)
 Connection of the Exhaust-Muffler Drain Pipe (Ref. Fig. 401/TASK 49-11-11-991-010)

 (a)
 Remove the blanking plugs from the disconnected line ends.

 (b)
 Connect the exhaust-muffler drain pipe (35) at the T-fitting to the APU drain system.

 

 (4)
 Connection of the Generator Cables (Ref. Fig. 403/TASK 49-11-11-991-009)

 (a)
 Remove and discard the cable-ties which temporarily hold the phase leads (82) to the FWD RH tie rod.

 (b)
 Remove the plastic blanking caps from the ring terminals of the phase leads.

 (c)
 Remove the bolts (70) , the washers (84) and the cover (71) from the terminal block of the generator.

 (d)
 Remove the temporarily installed nuts (83) from the terminal studs.

 (e)
 Attach the phase leads (82) with the washers (85) and the nuts

 


 (83) to the correct terminal studs on the generator (80). Connect:
 CAUTION : MAKE SURE THAT THE WASHER IS INSTALLED BETWEEN THE
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2(49)