• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:35来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1) Inspection of the tie-rods and bonding straps.
 (a) Examine the tie-rods (3) for damage (scratches and cracks) and corrosion under a source of white light.
 NOTE : If you are not sure if a component has cracks, do a crack
____ detection test with a dye penetrant.
 (b) Make sure that the tie-rods and the the tie-rod attachments are not bent.
 NOTE : Do the check with the straight-edges. On each tie-rod
____ assembly, you must do two checks in an angle of 90 degrees apart. On the tie-rods which hold the forward vibration isolators (4035KM and 4045KM), you must do the check with a straight-edge, 500mm (20 in.) length. On the tie-rods which hold the aft vibration isolators (4055KM), you must do the check with a straight-edge, 300 mm (12 in.) length. Move the straight-edges along the tie-rods to check the full length.
 (c)
 Make sure that the nuts of the bolts (1) are safetied with cotter pins and that they are in correct condition.

 (d)
 Make sure that the nuts (2) are safetied with the lockwashers.

 (e)
 Examine the bonding straps (8) for correct attachment and condition.


 NOTE : If one of the following component are not in correct
____
 condition, replace them.

 -
FWD LH tie-rods and vibration isolators (Ref. TASK 49-12-51-000-003) and (Ref. TASK 49-12-51-400-003).

 -
FWD RH tie-rods and vibration isolators (Ref. TASK 49-12-52-000-003) and (Ref. TASK 49-12-52-400-003).


 -AFT tie-rods and vibration isolators (Ref. TASK 49-12-53-000-003) and (Ref. TASK 49-12-53-400-003).

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-12-00Page 605 201-210, Config-2 Aug 01/05
 CES


 APU Mounts Figure 601/TASK 49-12-00-991-007- 12 (SHEET 1)

R EFF : 001-049, 101-105, 201-203, 49-12-00Page 606 Config-2 May 01/05
 CES


 APU Mounts Figure 601/TASK 49-12-00-991-007- 22 (SHEET 2)

R EFF : 001-049, 101-105, 201-203, 49-12-00Page 607 Config-2 May 01/05
 CES


 APU Mounts
 Figure 601A/TASK 49-12-00-991-007-A12 (SHEET 1)

 CES


 APU Mounts
 Figure 601A/TASK 49-12-00-991-007-A22 (SHEET 2)

 CES


 (2) Inspection of the vibration isolators, coverplates and APU mount brackets.
 (a) Examine the vibration isolators (4), coverplates (9) and the APU mount brackets (7) for damage and corrosion under a source of white light.
 NOTE : If you are not sure if a component has cracks, do a crack
____
 detection test with a dye penetrant.

 (b)
 Visually examine the vibration isolator self-lock nuts (5), make sure that the red varnish torque position marks are in line.

 (c)
 Make sure that bolts (6) of the APU mount brackets (7) are safetied with lockwire and that the lockwire is in correct condition.

 (d)
 Measure the distance between the lower surface of the vibration isolator and the upper surface of the APU mount brackets with a caliper gauge. Make sure that the measured distances are not greater than the permitted dimensions DIM A and DIM B.


 NOTE : The permitted dimensions are:
____
 -
DIM A is max 9.5 mm (0.3740 in.)

 -
DIM B is max 18.0 mm (0.7086 in.) If you find that:


 -the measured distance on any or all of the vibration isolator(s) is greater than the permitted DIM A and DIM B than you must replace all of the vibration isolators.
 NOTE : If one of the following component are not in correct
____
 condition, replace them.

 -
FWD LH tie-rods and vibration isolators (Ref. TASK 49-12-51-000-003) and (Ref. TASK 49-12-51-400-003).

 -
FWD RH tie-rods and vibration isolators (Ref. TASK 49-12-52-000-003) and (Ref. TASK 49-12-52-400-003).


 -AFT tie-rods and vibration isolators (Ref. TASK 49-12-53-000-003) and (Ref. TASK 49-12-53-400-003).
 -APU mount brackets (Ref. TASK 49-12-54-000-003) and (Ref. TASK 49-12-54-400-003).
 (3) Examine the structural brackets for damage and corrosion under a source of white light.
 NOTE : If you are not sure if a component has cracks, do a crack
____
 detection test with a dye penetrant.


R  EFF : 001-049, 101-105, 107-107, 151-199, 49-12-00Page 610 201-210, Config-2 Aug 01/05
 CES  5. Close-up


________ Subtask 49-12-00-410-057
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Set the LIGHT SW 11LJ to the OFF position.

 (3)
 Close the APU access doors 316AR, 315AL (Ref. TASK 52-41-00-410-001) .
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2(74)