24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector 49-16-00-040-003 Deactivation of the APU Air Intake Flap (131-9(A)) 49-16-00-100-003 Cleaning of the APU Air Intake System (131-9(A)) 49-16-00-991-006 Fig. 601

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-00Page 601 201-210, Config-2 Aug 01/05
 CES  3. Job Set-up


__________ Subtask 49-16-00-860-064
 A. Aircraft Maintenance Configuration
 (1)
 Put the warning notice in position on the panel 25VU to tell persons not to start the APU.

 (2)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (3)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).

 

 Subtask 49-16-00-010-066
 B. Get Access
 (1) Open the air intake flap if it is not in the open position. WARNING : MAKE SURE THAT THE TRAVEL RANGE OF THE AIR-INTAKE SYSTEM
_______ COMPONENTS IS CLEAR. MOVEMENT OF AIR-INTAKE SYSTEM COMPONENTS CAN CAUSE INJURY AND/OR DAMAGE.
 (a) On the panel 25VU push the APU MASTER SW p/bsw (the blue ON light comes on).
 NOTE : The air intake flap-actuator 4015KM starts to operate
____ immediately. It opens the air intake flap when you push the APU MASTER SW pushbutton switch. It stops automatically in the flap open position. To keep the air intake flap in the open position for the subsequent procedure, you must open the circuit breakers. Then you release the APU MASTER SW pushbutton switch. Alternatively you can open the air intake flap manually (Ref. TASK 49-16-00-040-003).
 (2)
 Put the access platform in position below the APU compartment and the air intake.

 (3)
 Open access doors 315AL, 316AR.

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-00Page 602 201-210, Config-2 Aug 01/05
 CES  Subtask 49-16-00-865-081


 C. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU APU/FUEL/BLOW OFF/PUMP 2QC B14 49VU AIR BLEED/X FEED/VALVE/BAT 2HV D13 121VU APU/FUEL/BLOW OFF/CTL 1QC K39 121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41 121VU APU/FUEL/LP VALVE/CTL 1QF M40 121VU APU/FUEL/LP VALVE/SPLY 2QF M39 121VU APU/FUEL/PUMP/CTL 3QC M38
 4. Procedure_________
 Subtask 49-16-00-210-053
 A. Visual Inspection
 (Ref. Fig. 601/TASK 49-16-00-991-006)

 (1)
 Before inspection clean the air intake system (Ref. TASK 49-16-00-100-003).

 (2)
 Examine the flexible seals (4), (7) and (9) for wear, tears and porosity.

 (a)
 If there is any damage replace the related seal(s).

 (b)
 Measure the dimension K of the seal (4) in the expanded condition. The seal must be a minimum of x + 2mm.

 


 NOTE : X is the dimension between the inlet duct Y seal support
____ frame and the inlet plenum frame of the APU compressor, the clearence must be 18.0 +2.0 -6.0mm (0.7086 +0.0787 -0.2362in.) with closed 316AR APU door. K is the expanded seal height, this is the average hight of the two sides. (inner and outer flange).
 (c) Measure the dimension L of the seal (7) in the expanded condition. The seal must be a minimum of 20 mm (0.7874 in.) from the surface of the nut-plate to the top face of the seal at all points of conntact.

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-00Page 603 201-210, Config-2 Aug 01/05
 CES


 Air Intake System
 Figure 601/TASK 49-16-00-991-006

 CES


 (3)
 Air Intake System

 (a)
 Examine the air intake system external and internal surfaces for delamination, distortion and cracks. Examine the diverter (1) for damage.

 (b)
 Examine damage to the air intake system caused by ice particles, corrosion, erosion or unwanted objects.

 (c)
 Do a tap check on all of the air intake system feltmetal surfaces, the guide surfaces and the guide vanes (5).

 

 (4)
 Do a tap check for dalamination on the external sandwich structure of the air inlet duct (2), air intake nose (8) and the air intake flap (10). Do this at distances of 20 mm (0.7874 in.) in rows of 20 mm (0.7874 in.) apart.
 