R **ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 29-12-41-710-050
E. Test of the Reservoir
(1)
Do an operational test of the low level warning (Ref. TASK 29-31-00-710-001).
(2)
Do an operational test of the low air pressure warning (Ref. TASK 29-34-00-710-001).
(3)
Make sure that the fluid level in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).
(4)
Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).
(5)
Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
(6)
On the ECAM control panel of the center pedestal, push the HYD pushbutton. Make sure that the HYD page on the ECAM lower DU comes on.
(7)
Make sure that the two reservoir content gages (one on the reservoir and one on the ground service panel of the Green hydraulic system) show the same contents and agree with the ECAM contents indication.
(8)
Examine the reservoir and the pipe connections and make sure that there are no leaks.
(9)
Apply leak detector SPECIAL MATERIALS (Material No. 05-004) to the reservoir and air pipe connections and make sure that there are no leaks.
(10)
Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(11)
Keep the Blue hydraulic system pressurized for 5 minutes to let the hydraulic system bleed.
(12)
Do the bleeding procedure of the Blue hydraulic system (Ref. TASK 29-00-00-870-008) and (Ref. TASK 29-00-00-870-009).
(13)
Do the RAT bleeding procedure (Ref. TASK 29-00-00-870-010).
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 29-12-41Page 422 1 1 May 01/05 1 1 1CES 1
(14) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
R **ON A/C 001-049, 051-061, 101-105, 151-199, 201-203, 301-399, 401-499, Post SB 29-1111 For A/C 001-049,051-061,101-105,201-203, Subtask 29-12-41-710-050-A
E. Test of the Reservoir
(1)
Do an operational test of the low level warning (Ref. TASK 29-31-00-710-001).
(2)
Do an operational test of the low air pressure warning (Ref. TASK 29-34-00-710-001).
(3)
Make sure that the fluid level in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002).
(4)
Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-002).
(5)
Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
(6)
On the ECAM control panel of the center pedestal, push the HYD pushbutton. Make sure that the HYD page on the ECAM lower DU comes on.
(7)
Make sure that the two reservoir content gages (one on the reservoir and one on the ground service panel of the Green hydraulic system) show the same contents and agree with the ECAM contents indication.
(8)
Examine the reservoir and the pipe connections and make sure that there are no leaks.
(9)
Apply leak detector SPECIAL MATERIALS (Material No. 05-004) to the reservoir and air pipe connections and make sure that there are no leaks.
(10)
Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(11)
Keep the Blue hydraulic system pressurized for 5 minutes to let the hydraulic system bleed.
R R (12) Do the bleeding procedure of the Blue hydraulic system (Ref. TASK 29-00-00-870-008) and (Ref. TASK 29-00-00-870-009).
R (13) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3(67)