(7)
If the bolts (1) are safetied with lockwire:
-Remove and discard the lockwire from the bolts (1) and the coupling half (46).
(8)
Hold the manifold (7) and remove the bolts (1) and washers (2).
(9)
Remove the manifold (7) from the aircraft.
(10) Install blanking plugs in all pipe connections and manifold ports.
R 1EFF : 059-061, 102-149, 151-199, 201-299, 1 29-13-15Page 408 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C ALL
TASK 29-13-15-400-001
Installation of the Power Transfer Unit (PTU) Manifold of the Yellow Hydraulic System
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs No specific container No specific plastic bags No specific plastic or wooden scraper No specific warning notices No specific access platform 2.4 m (7 ft. 10 in.) No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft) No specific Torque Wrench : range 1.00 to 10.00 m.daN
(8.00 to 75.00 lbf.ft) No specific Torque Wrench : range 2.00 to 20.00 m.daN
(15.00 to 150.00 lbf.ft)
R 1EFF : ALL 1 29-13-15Page 409 1 1 May 01/04 1 1 1CES 1
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R Material No. 02-003 Material No. 09-013 Material No. 09-018 Material No. 16-003 Material No. 19-010 F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)USA MIL-PRF-81733 TYPE I CLASS A CORROSION INHIBITING BRUSH CONSISTENCY (Ref. 20-31-00)USA AMS 3267/3 CORROSION INHIBITING LOW ADHESION SEALANT (Ref. 20-31-00)F ASNB70720 COATING (OBSOLETE USE 16-021) (Ref. 20-31-00)USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
RRR 10 10 15 23 31 35 35 36 36 37 37 38 39 40 41 47 52 square-section seals square-section seals O-ring O-ring square-section seals O-rings packings back-up rings back-up rings back-up rings back-up rings O-rings back-up rings back-up rings back-up rings packing packing 29-13-15 02B-14029-13-15 02C-09029-13-15 02B-040 29-13-15 02B-060 29-13-15 02B-14029-13-15 02B-11029-13-15 02C-07029-13-15 02B-12029-13-15 02C-08029-13-15 02B-13029-13-15 02C-10029-13-15 02B-11029-13-15 02B-12029-13-15 02B-13029-13-15 20A-01029-13-15 02B-060 29-13-15 05B-030
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
52 packing 29-13-15 05C-030 53 packing 29-13-15 05B-030 53 packing 29-13-15 05C-030
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
20-23-21-911-001 Removal/Installation of the Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins
20-28-00-912-004 Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-13-33-000-001 Removal of the Priority Valve of the Yellow Hydraulic
System (3064GM) 29-13-33-400-001 Installation of the Priority Valve of the Yellow
Hydraulic System (3064GM) 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector 29-23-00-710-002 Operational Check of PTU Green to Yellow 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU) 29-23-00-860-002 Connection of the Isolation Coupling of the Power Transfer Unit (PTU) 29-23-51-000-002 Removal of the Solenoid Valve 3012GL of the Power Transfer Unit 29-23-51-400-002 Installation of the Solenoid Valve 3012GL of the
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3(116)