(55.30 and 61.20 lbf.ft).
(19)
Remove the blanking caps from the electrical connectors.
R 1EFF : 059-099, 102-149, 151-199, 201-299, 1 29-13-14Page 422 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
(20)
Make sure that the electrical connectors are clean and in the correct
condition.
(21)
Connect the electrical connectors (5),(41),(42),(43) to the
receptacles on the manifold (17).
**ON A/C ALL
Subtask 29-13-14-865-052
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1841GN, 1881GP, 3801GX, 3802GX, 3803GX
Subtask 29-13-14-860-051
D. Preparation for the Test
(1)
Pressurize the reservoir of the Yellow hydraulic system (Ref. TASK 29-14-00-614-002).
(2)
Make sure that the fluid level in the reservoir of the Yellow hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001).
(3)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(4)
Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
(5)
On the ECAM control panel on the center pedestal, push the HYD pushbutton. Make sure that the HYD page on the system (lower) display comes on.
1EFF : ALL 1 29-13-14Page 423 1 1 May 01/05R 1 1 1CES 1
Subtask 29-13-14-710-050
E. Do this test:
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. Pressurize the Yellow hydraulic
system (Ref. TASK 29-10-00-863-
002).
2. Examine the HP manifold and the No leaks.
pipe connections for leaks.
3. Compare the hydraulic pressure The digital pressure indication agrees
indication on the ECAM system with the indication on the pressure
(lower) display with the gage 3072GM.
indication on the pressure gage
3072GM of the Yellow power
accumulator.
4. On the panel 50VU: On the panel 50VU:
- lift the guard and set the - the OFF legend of the HYD/LEAK
HYD/LEAK MEASUREMENT VALVES /Y MEASUREMENT VALVES/Y P/BSW comes on.
pushbutton switch (P/BSW) to
OFF. On the lower display unit (DU) of the
ECAM system:
- the flow arrow and system name of the
Yellow system change color to amber.
5. On the panel 50VU: On the panel 50VU:
- set the HYD/LEAK MEASUREMENT - the OFF legend of the HYD/LEAK
VALVES/Y P/BSW to on. MEASUREMENT VALVES/Y P/BSW goes off.
On the lower DU of the ECAM:
- the color of the Yellow system flow
arrow changes to green and the color
of the system name changes to white.
6. Control the hydraulic supply to The ECAM pressure indication agrees
reduce the Yellow system with the indication on the pressure
pressure. Compare the indication gage 3072GM.
1EFF : ALL 1 29-13-14Page 424 1 1 May 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------of the ECAM system display with the indication on the pressure gage 3072GM.
5. Close-up
________ Subtask 29-13-14-860-052
A. Put the aircraft back to the serviceable condition.
(1)
Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002).
(2)
Make sure that the reservoir of the Yellow hydraulic system is pressurized (Ref. TASK 29-14-00-614-002).
(3)
Make sure that the fluid level in the Yellow hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-611-001).
(4)
Connect the isolation coupling of the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-860-002).
(5)
Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(6)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
(7)
Remove the container from below the HP manifold.
(8)
Remove the warning notices from the cockpit and the ground service panel.
(9)
Make sure that the work area is clean and clear of tool(s) and other items.
(10)
Close the access door 196BB.