C.
Open the access door 197EB.
4. Procedure
_________
(Ref. Fig. 401/TASK 29-12-35-991-001) Subtask 29-12-35-020-050
A. Removal of the Reservoir Drain Valve
(1)
Remove and discard the lockwire from the reservoir drain valve (1).
(2)
Remove the reservoir drain valve (1) from the adaptor (3).
(3)
Remove and discard the O-ring (2).
(4)
Install the blanking plugs on the adaptor (3) and the reservoir drain valve (1).
Reservoir Drain Valve
Figure 401/TASK 29-12-35-991-001
1EFF : ALL 1 29-12-35 Page 404
1 1 Feb 01/98
1 1
1CES 1
TASK 29-12-35-400-001 Installation of the Reservoir Drain Valve (2264GM) WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container
No specific warning notices
No specific Torque Wrench : range 1.00 to 10.00 m.daN
(8.00 to 75.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific lockwire 0.8 mm (0.032 in.)
R Material No. 02-003 F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
O-ring 29-12-04 11 -260R D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector
29-12-35-991-001 Fig. 401
3. Job Set-up
__________
Subtask 29-12-35-860-051
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2)
Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).
(3)
Make sure that the reservoir of the Blue hydraulic system is depressurized. (Ref. TASK 29-14-00-614-001).
(4)
Make sure that the access panel 197EB is open.
(5)
Make sure that the container is in position.
(6)
Make sure that the warning notices are in position to tell persons not to pressurize the Blue hydraulic system:
-in the cockpit on the hydraulic section 40VU of the overhead panel, - on the ground service panel of the Blue hydraulic system.
Subtask 29-12-35-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12 123VU B HYD/ELEC PUMP 2701GJ AB09
4. Procedure
_________
(Ref. Fig. 401/TASK 29-12-35-991-001) Subtask 29-12-35-420-050
A. Installation of the Reservoir Drain Valve
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Remove the blanking plugs from the adaptor (3) and the reservoir drain valve (1).
(4)
Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the adaptor (3) and to the O-ring (2).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3(49)