• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:37来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

No specific circuit breaker(s) safety clip(s) No specific 1 CAP - BLANKING No specific 1 PLUG - BLANKING No specific 1 WARNING NOTICE
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-12-22-991-001 Fig. 401


 3. Job Set-up
__________ Subtask 29-12-22-865-050
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12 121VU HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST 1881GP N35 123VU B HYD/ELEC PUMP 2701GJ AB09
 Subtask 29-12-22-860-050
 B. Aircraft Maintenance Configuration
 (1)
 Put the WARNING NOTICE in position to tell persons not to pressurize the Blue hydraulic system:

 -In the cockpit on the hydraulic section 40VU of the overhead panel
 -On the ground service panel of the Blue hydraulic system.

 (2)
 Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (3)
 Depressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-001).


 Subtask 29-12-22-010-050
 C. Open the access door 195BB.
 4. Procedure
_________ (Ref. Fig. 401/TASK 29-12-22-991-001) Subtask 29-12-22-614-050
 A. Depressurize the Power Accumulator (2072GM)
 (1)
 Remove the endcap (6) from the charging-valve (4).

 (2)
 Turn the nut (5) carefully to the OPEN position and release the nitrogen pressure.

 


 Gas Charging Valve
 Figure 401/TASK 29-12-22-991-001
 1EFF :  ALL  1  29-12-22 Page 403 
1  1  May 01/05
 1  1
 1CES  1

 

 Subtask 29-12-22-020-050
 B. Removal of the Gas Charging-valve (2071GM)
 (1)
 Cut, remove and discard the lockwire from the gas charging-valve (4).

 (2)
 Remove the gas charging valve (4)

 (3)
 Install the PLUG - BLANKING in the adapter (2).

 (4)
 Install the CAP - BLANKING on the gas charging-valve (4).

 


 TASK 29-12-22-400-001
 Installation of the Accumulator-Gas Charging Valve (2071GM)
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 CAP - BLANKING No specific 2 PLUG - BLANKING No specific 2 WARNING NOTICE No specific Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00
 to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)

 B.
 Consumable Materials


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 02-003  F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
 Material No. 05-004  USA MIL-L-25567 TYPE I OXYGEN LEAK DETECTOR (Ref. 20-31-00)
 Material No. 19-010  USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)


 C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
3  o-ring  29-14-14 01 -010
 D. Referenced Information
 ------------------REFERENCE  -------------------------------DESIGNATION ------------------------------

-------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-14-29-614-001 Fill the Hydraulic Power Accumulators 1070GM/2070GM/3070GM with Nitrogen 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3(39)