 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-12-17-991-001 Fig. 401


 3. Job Set-up
__________ Subtask 29-12-17-865-051
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/HYD PWR/B WARN/& CTL 2702GJ C12 123VU B HYD/ELEC PUMP 2701GJ AB09
 Subtask 29-12-17-860-050
 B. Aircraft Maintenance Configuration
 WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.

_______
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001).

 (3)
 Depressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-14-00-614-001).

 (4)
 Put the warning notice(s) in position to tell persons not to pressurize the Blue hydraulic system:

 -In the cockpit on the hydraulic section 40VU of the overhead panel,
 -On the ground service panel of the Blue system.

 (5)
 Put the container in position below the pressure switch to collect hydraulic fluid.


 Subtask 29-12-17-010-051
 C. Open the access panel 195BB.


 4. Procedure
_________
 (Ref. Fig. 401/TASK 29-12-17-991-001) Subtask 29-12-17-020-051
 A. Removal of the Electric Pump Pressure Switch
 (1)
 Disconnect the electrical connector (1).

 (2)
 Put a blanking cap on the disconnected electrical connector.

 (3)
 Cut and remove the lockwire.

 (4)
 Loosen the pressure switch (2) and remove it together with the O-ring

 (3) from the T-fitting (4).

 (5)
 Discard the O-ring.

 (6)
 Install blanking plugs in the open ports.

 


 Electric Pump Pressure-Switch
 Figure 401/TASK 29-12-17-991-001
 1EFF :  ALL  1  29-12-17 Page 404 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 29-12-17-400-001 Installation of the Electric Pump Pressure-Switch (2074GJ) WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
 CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container
 No specific warning notices
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific  lockwire 0.8 mm (0.032 in.)
R  Material No. 02-003 F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
3 O-ring 29-12-03 12A-140 3 O-ring 29-12-03 12B-140


 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
 