 No specific access platform 3 m (9 ft. 10 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-11-52-991-003 Fig. 601 3. Job Set-up


__________
 (Ref. Fig. 601/TASK 29-11-52-991-003)
 Subtask 29-11-52-941-055

 A. Safety Precautions
 (1)
 Put the safety barriers in position.

 (2)
 Put a warning notice in position to tell persons not to pressurize the Green Hydraulic system.


 Subtask 29-11-52-865-053
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/FIRE VALVE/G/ENG1 1703GK C13 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
 **ON A/C 001-049, 051-061, 101-103, 201-203,
 Subtask 29-11-52-010-052
 C. Get Access
 (1) Put the access platform below zone 574.
 (2) Open the access panel 574AB. R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,
 Subtask 29-11-52-010-052-A
 C. Get Access
 (1)
 Put the access platform below zone 574.

 (2)
 Remove the access panel 574AB.

 


 Engine Pump Fire-Valve (1046GK)
 Figure 601/TASK 29-11-52-991-003
 1EFF :  ALL  1  29-11-52 Page 603 
1  1  Feb 01/98
 1  1
 1CES  1

 

 **ON A/C ALL
 4. Procedure
_________
 (Ref. Fig. 601/TASK 29-11-52-991-003)
 Subtask 29-11-52-210-052
 A. Inspection of the Engine Pump Fire-Valve
 (1)
 Examine the engine pump fire-valve (1) for damage, corrosion and signs of leakage.

 (2)
 Make an inspection of the line end-fittings and the electrical connector. Make sure they are correct and in a satisfactory condition.


 5. Close-up
________
 **ON A/C 001-049, 051-061, 101-103, 201-203,

 Subtask 29-11-52-410-051
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Close the access panel 574AB. R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,
 Subtask 29-11-52-410-051-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel 574AB.

 

 

R **ON A/C ALL
 Subtask 29-11-52-865-054
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1702GK, 1703GK.
 Subtask 29-11-52-942-052
 C. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 


 GROUND CONNECTOR - SELF-SEALING - REMOVAL/INSTALLATION
______________________________________________________ TASK 29-11-63-000-001 Removal of the Self-Sealing Ground Connectors of the Green Hydraulic System WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific warning notice
 No specific access platform 1.75 m (5 ft. 9 in.)
 No specific container 5.0 l (1.3208 USgal)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
 Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-11-63-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 29-11-63-860-050
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3(6)